Similar Projects
McKinney Jeep
New Construction - 31,900 SF
Design
$7,800,000 est. value
McKinney, TX 75072

RFI - Laughlin AFB MX Media Blast Room
Renovation
Design
Del Rio, TX 78840

Valvoline Instant Oil Change
New Construction - 3,763 SF
Bidding
$1,200,000 est. value
Webster, TX 77598

Sun Auto
Build-Out - 7,571 SF
Bidding
Garland, TX 75040

Valvoline Instant Oil Change
New Construction - 2,080 SF
Post-Bid
Schertz, TX 78154

Take 5 Oil Change
New Construction - 1,462 SF
Post-Bid
Less than $500,000 CJ est. value
Belton, TX 76513

Repair Maintenance Shop Bldg 8040
Renovation
Results
$1,000,000 to $5,000,000 est. value
TX

Valvoline Express Care
New Construction
Construction
$400,000 est. value
Denton, TX 76210

Lamborghini Dallas
Addition - 30,000 SF
Construction
Richardson, TX 75080

Tige Boats Restroom and Breakoom
New Construction - 601 SF
Pending Verification
$675,000 est. value
Abilene, TX 79602

David McDavid Acura
New Construction - 60,090 SF
Design
$15,000,000 est. value
Plano, TX 75093

FY18 Vehicle Maintenance Shop, Camp Bullis
Renovation
Bidding
San Antonio, TX 78257

Take 5 Oil Change
New Construction - 1,462 SF
Post-Bid
$400,000 est. value
San Antonio, TX 78247

R+L Carriers Trucking Terminal Complex
New Construction - 107,377 SF
Construction
$10,000,000 est. value
Waller, TX 77484

Holt Track Shop
New Construction - 25,320 SF
Design
$3,200,000 est. value
Georgetown, TX 78628

Reported 06/13/2022 04:00 PM
Project Title

Bluebonnet Dodge Commercial Truck Center

Physical Address View project details and contacts
City, State (County) New Braunfels, TX 78130   (Comal County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022, Construction Completion Expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 10, 2022, final design is underway. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin August 2022 and be completed January 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Vehicle Sales/Service, 1,977 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents