Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

SR 19: I-90 to Rotunda Dr
Infrastructure
Conception
$2,830,000 CJ est. value
Summit Township, PA 16441

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

SR 8009 Ramp C over I-79
Infrastructure
Design
$75,000 CJ est. value
Erie, PA 16501

Holly Acres Estates - Well 2 Connection
Infrastructure
Bidding
$400,000 CJ est. value
Erie, PA 16509

Furnish All Equipment, Materials and Labor for Double Application of Micro-surfacing on Various Township Roads
Infrastructure
Bidding
$500,000 CJ est. value
Fairview, PA 16415

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Miscellaneous Couplings, Clamps and Saddles
Infrastructure
Results
Erie, PA

Curb Boxes and Rods
Infrastructure
Results
Erie, PA

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Erie 2022 Bridge Shotcrete Group
Infrastructure, Renovation
Design
$380,000 CJ est. value
Erie, PA 16504

Kuhl Road Culvert No. 2 Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Erie, PA 16510

2021 Water Line Replacement Project
Infrastructure
Post-Bid
Erie, PA

Service Connection Replacement Project
Infrastructure
Results
Erie, PA

Last Updated 01/25/2023 08:35 AM
Project Title

East Gore and West Lake Pump Station Modifications

Physical Address View project details and contacts
City, State (County) Millcreek Township, PA 16506   (Erie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Supply and install new concrete wet well and valve vault, install Owner-furnished submersible pumps, supply and install piping to connect to existing gravity and pressure sewer, dismantle and remove existing wet well and pump pit, restore site fencing and surfaces.West Lake Pump Station - Reconfigure existing concrete wet well for use as submersible pump station, dismantle and demolish existing pump pit and equipment, supply and install new concrete valve vault, install Owner-furnished submersible pumps, supply and install piping to connect to existing gravity and pressure sewer, restore site fencing and surfaces. Addenda, if any, will be issued to only those persons or companies who have purchased a full set of Contract Documents. Bidders may mail their Bid Forms to us in time for the bid opening or they can place them in the drop box by the mailbox in front of the Municipal Building. Each bid must be submitted on the bid form provided in the bidding documents and accompanied by a bid guarantee in the form of a certified or cashier's check or bid bond with corporate surety payable to Millcreek Township in an amount equal to ten percent (10%) of the bid price. Bidders are advised that this Project is subject to the Pennsylvania Department of Labor and Industry Prevailing Wage Rate Determinations. The Wage Rate Determinations provided by the Pennsylvania Department of Labor and Industry are included in the Contract Documents. Bids shall remain open and valid for a period of 60 days from the date of opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the Bid opening. Bids may not be withdrawn during this period. The Township reserves the right to reject any or all bids or to waive any informalities in the bidding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents