Similar Projects
John R. Pierce School
Addition
Conception
Brookline, MA 02446

Hingham Foster Elementary School
Renovation, Addition
Conception
$40,000,000 to $55,000,000 est. value
Hingham, MA 02043

Lynch Elementary School Renovation
Renovation
Design
$75,000,000 est. value
Winchester, MA

Florence Roche Elementary School Construction
New Construction - 109,855 SF
Design
$61,500,000 est. value
Groton, MA 01450

Samuel Watson Elementary School Improvements Project - Phase II - General Bid
Renovation
Bidding
$4,560,000 est. value
Fall River, MA 02723

Minor Building Repair Services
Renovation, Term Contract
Bidding
$70,000 to $90,000 est. value
Lynn, MA

Florence Roche Elementary School
New Construction - 109,855 SF
Post-Bid
$61,500,000 est. value
Groton, MA 01450

Redevelopment of Elementary School Wilbraham Avenue
Post-Bid
Springfield, MA

Owner's Project Management Services for the Central Kitchen
Results
Less than $3,000,000 est. value
New Bedford, MA 02740

Cunniff and Hosmer Elementary Schools - General Bids
New Construction - 305,460 SF
Results
$97,565,055 est. value
Watertown, MA

New George H Mitchell Elementary School - General Bids
New Construction - 136,000 SF
Construction
$60,500,000 est. value
Bridgewater, MA 02324

Dexter Southfield School
Addition - 30,000 SF
Construction
$7,777,613 est. value
Brookline, MA 02445

Bowe School Ventilation Repairs
Pending Verification
$300,000 est. value
Chicopee, MA 01013

Sela International School - Interior Modifications
Renovation
Pending Verification
Hingham, MA 02043

Construction of New Classroom
New Construction
Bidding
$12,000,000 est. value
Marlborough, MA

Last Updated 12/21/2021 10:48 AM
Project Title

Samuel Watson Elementary School Improvements Project - Phase II - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Fall River, MA 02720   (Bristol County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,560,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Required Includes the following major items: a. Removal and disposal of existing sidewalks, pavement, and landscaping b. Removal and disposal of existing bathroom fixtures and finishes c. Removal and disposal of building electrical power and lighting system d. Selective demolition of existing wall and ceilings to facilitate bathroom renovations and accessibility upgrades e. Installation of new bathroom fixtures and finishes f. Installation of new elevator and construction of machine room g. Installation of new exterior entrance stairs h. Installation of new drops and sprinkler heads from existing overhead fire suppression system. i. Installation of a new acoustical ceiling and lighting system j. Installation of a new building-wide HVAC system k. Installation of a new fire alarm devices l. Painting

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents