Similar Projects
Last Updated | 06/29/2022 10:13 AM |
Project Title | Construction of Detention Basin Phase 1 Facilities for Hallimore Ranch |
Physical Address | View project details and contacts |
City, State (County) | TX (Fort Bend County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work of the Contract includes: 1. Approx. 4,650 LF of 6-foot wide concrete pilot channel. 2. Approx. 1,010 LF of 24-inch wide RCP Pipe. 3. Approx. 395 LF of 60-inch wide RCP Pipe. 4. Approx. 1,805 LF of 6-foot by 6-foot RCP Box. 5. Approx. 630,617 CY of excavation and on-site fill placement for the basin. 6. Approx. 1,381 SY of 5-inch concrete slope paving. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |