Similar Projects
Asphalt Resurface, Bridge and Pavement Replacement
New Construction, Infrastructure
Bidding
IN

Bridge Painting and Thin Deck Overlay
Infrastructure, Alteration
Bidding
IN

Cowan Road Widening
Post-Bid
Muncie, IN 47305

Cagles Mill and Harden Lakes Asphalt
Post-Bid
$25,000 to $100,000 est. value
Hollandsburg, IN 47872

Asphalt Resurface
Results
IN

Asphalt Resurface
Results
IN

Salisbury Street / Grant Street Redevelopment
Pending Verification
West Lafayette, IN 47906

Road and Bridge Reconstruction with Added Travel Lanes
New Construction, Infrastructure
Bidding
IN

Furnishing and Application of Hot Mastic Asphalt (HMA) for Dickinson Road and Rail Road
Post-Bid
Chesterton, IN 46304

Four Porter County Roadway - Project C
Results
Valparaiso, IN 46383

Hot Mix Asphalt Laid
Infrastructure
Bidding
Corydon, IN

2021-01 Road Paving - Eaton-Wheeling
Post-Bid
Muncie, IN 47302

Four Porter County Roadway - Project D
Results
Valparaiso, IN 46383

Challenger Avenue Extension
Post-Bid
West Lafayette, IN 47906

2020 Street Resurfacing Phase 2
Results
Mount Summit, IN 47361

Last Updated 09/02/2021 10:18 AM
Project Title

2021 Road Resurfacing Projects

Physical Address View project details and contacts
City, State (County) Rossville, IN 46065   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $161,108
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All segments will be 2” milling and asphalt re-surfacing. Segment One: West Ramey Street starting from the west side of the intersection at North Gaddis Street and continuing west for 1800 feet. Segment Two: North Gaddis Street starting from the north side of the intersection of West Ramey Street continuing north for 750 feet. Segment Three: Meadow Court from West Ramey Street to end of Cul-de-sac. Segment Four: Rainbow Court from West Ramey Street to end of Cul-de-sac. Segment Five: Rainbow Drive from the north side of the intersection at West Ramey Street continuing north for 600 feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents