Similar Projects
Split System and Rooftop A/C Replacement
Alteration
Post-Bid
Louisville, KY 40212

Custom Air Handling Unit
Renovation
Post-Bid
$800,000 CJ est. value
Lexington, KY 40508

PAV WH Replace AHU 4 and 5 - 2553.0
Infrastructure
Results
$1,425,000 est. value
Lexington, KY

Cooling Plant 1 Tower Replacement - Phase III
Alteration
Results
Lexington, KY 40502

Construction to Upgrade Chiller Plant
Renovation
Post-Bid
$5,000,000 CJ est. value
Lexington, KY 40511

Blue Grass Airport - Boiler Room 1 - Chiller Replacement - 2112
Alteration
Results
$275,000 est. value
Lexington, KY

HVAC Repair
Term Contract
Post-Bid
Lexington, KY 40508

Fine Arts Building Elevator Modernization
Renovation
Results
Lexington, KY 40508

Whitaker Family YMCA Swimming Pool HVAC Replacement
Build-out
Post-Bid
$1,500,000 CJ est. value
Lexington, KY 40509

Repair/Upgrade/Expand Central Plant - Deaerators Phase 1
Renovation, Infrastructure
Results
$250,000 est. value
Lexington, KY 40502

Chemistry Physics Building - Heat Exchange
Renovation
Post-Bid
Lexington, KY 40508

Phi Gamma Delta Chiller Project
Renovation
Results
$247,800 CJ est. value
Lexington, KY 40508

HVAC York Fan Boxes
Term Contract
Post-Bid
Lexington, KY 40510

Cooling Plant #1 Tower Replacement Phase 4
Renovation
Results
$1,435,000 CJ est. value
Lexington, KY 40508

Refrigeration and Cooling System Services
Term Contract
Post-Bid
Lexington, KY 40508

Last Updated 03/25/2023 01:07 AM
Project Title

SAE Chiller Project

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $110,874 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project requires removal of the existing indoor chiller, outdoor condensing unit, piping, and ancillary equipment associated with the system. Installation of UK provided 110-ton Trane air-cooled packaged chiller. Contractor will have to move UK chiller from storage to worksite. Includes installation of new piping, valves, insulation, sensors, and electrical service, the chiller All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Anyone wishing to discuss specific items is requested to submit the items in writing to the Capital Construction Procurement Office, no later than 12/23/2022. Written questions can be submitted by email to: cckbidquestions@uky.edu. RIGHT TO REJECT The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. If you have any questions, please feel free to contract David D. Stefanic- 859-257-5792, david.stefanic@uky.edu THIS PROJECT REPLACES THE EXISTING AIR-COOLED CHILLER WITH A NEW AIR-COOLED CHILLER UNIT. UNIT WILL BE PROVIDED BY OWNER AND INSTALLED BY MECHANICAL CONTRACTOR. This project will include the following general aspects of work: SAE CHILLER INSTALLATION PROJECT Remove the existing indoor chiller, outdoor condensing unit, piping, and and ancillary equipment associated with the system. Pickup of UK owned air-cooled packaged chiller (Trane 110 ton) at the Vaughn Warehouse (1247 Versailles Road, Lexington) and install the new chiller at SAE house (410 Rose Lane, Lexington). Includes installation of new piping, valves, insulation, sensors, and accessories as indicated. Includes relocation of surge panel and connection of new power circuit to the new chiller. System Balancing and Certification required: Provide a final, certified air & water test and balance of the new system with all valves, sensors, etc. in normal operating position for cooling. Balance & adjust the chilled water flow to meet design requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents