Similar Projects
O'Reilly Auto Parts #4033 (SP3)
Renovation - 6,800 SF
Conception
Springfield, MO

Providence South Plaza
New Construction, Infrastructure
Conception
$25,000,000 est. value
Columbia, MO 65201

Zhou Brothers Art Center
Renovation
Design
$20,000,000 est. value
Kansas City, MO 64127

Sephora
Renovation - 2,500 SF
Design
Springfield, MO 65804

Midland Apartments
Build-out, Renovation, Infrastructure - 80,000 SF
Bidding
$20,000,000 CJ est. value
Kansas City, MO 64105

Family Dollar #29411 / Charleston
Renovation - 10,558 SF
Bidding
$50,000 CJ est. value
Charleston, MO 63834

Family Dollar
Renovation
Post-Bid
Hermann, MO

Hobby Lobby #32R
Renovation - 71,944 SF
Post-Bid
Springfield, MO 65804

Hamilton Tower Apartments Sewer Laterals and Kitchen
Renovation
Results
Jefferson City, MO 65101

Walmart Supercenter #2213-238 - DOF-2
Renovation - 250 SF
Construction
Saint Louis, MO 63125

Walmart Supercenter #188-251 - Entertainment Optimization
Renovation - 172,054 SF
Construction
Cape Girardeau, MO 63701

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Lakewood Apartments
New Construction
Pending Verification
Springfield, MO 65810

Ahm Locust Street Development
New Construction, Renovation, Demolition
Conception
$10,000,000 est. value
Saint Louis, MO 63103

Sephora
Renovation - 2,500 SF
Design
MO 64081

Last Updated 09/21/2022 10:11 AM
Project Title

Joplin Family YMCA Redevelopment

Physical Address View project details and contacts
City, State (County) Joplin, MO 64804   (Jasper County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans include the redevelopment of the former YMCA building to 40 affordable apartment units. As of September 21, 2022, the project is in design. An architect and general contractor have been selected. A firm construction timeline has not been set, however, construction is not expected to begin prior to late 2022.

Details

Renovation, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents