Similar Projects
Replace Ceiling Grid System in Room 109
Post-Bid
San Antonio, TX 78204

CE Trade BPA Dry Wall
Term Contract
Post-Bid
Randolph Air Force Base, San Antonio, TX 78275

VCT Removal and Waterproofing of Shower Floors
Results
Less than $269,957 est. value
San Antonio, TX 78207

San Antonio Regional HQ Interior Refresh
Post-Bid
San Antonio, TX 78223

Final Cleaning, Signage, Wall Graphics, Landscaping and Unit Paving
Infrastructure, Alteration
Post-Bid
San Antonio, TX 78204

RFI: Drywall/Structural Repair Trade BPA
Post-Bid
San Antonio, TX 78236

MWD Kennel Curtains
Term Contract
Bidding

MWD Kennel Curtains
Term Contract
Bidding

San Antonio Babcock AO - Refresh Interior, Doors
Results
$66,736 est. value
San Antonio, TX 78201

San Antonio HQ Interior Upgrades
Results
San Antonio, TX 78223

CCSD Modular Furniture
Post-Bid
San Antonio, TX 78243

Acoustical Ceiling and Fabric Wall Panels at Tafolla MS
Alteration
Results
$450,000 est. value
San Antonio, TX 78207

Seguin AO - Interior Refresh
Results
Less than $17,343 est. value
Seguin, TX 78155

Seguin AO Install
Post-Bid
Seguin, TX 78155

Install OSB
Results
Less than $398,349 est. value
TX

Reported 07/23/2021 12:00 AM
Project Title

Relocate Big Top Canopy Shelters

Physical Address View project details and contacts
City, State (County) Randolph Air Force Base, Seguin, TX (Bexar, Guadalupe Counties)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is for the disassembly, transport, and reassembly of all related components of two (2) Big Top canopies. The requirement includes canopy framing, fabric, chained concrete jersey barriers and all related hardware. The Government shall not exercise any supervision or control over contractor personnel or subcontractor personnel during the disassembly, transport, and reassembly process.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents