Similar Projects
HVAC Upgrades at Middletown High School and Aquidneck Elementary School
Bidding
Middletown, RI 02842

Construction - B1320 HVAC Retrofit
Bidding
$100,000 to $250,000 est. value
Newport, RI 02841

Additional Cooling B-1351 NUWCDIVNPT
Post-Bid
$100,000 to $250,000 est. value
Newport, RI 02841

District Wide Heating and Ventilation
Post-Bid
Westerly, RI 02891

Dust Collection System
Results
Providence, RI

HVAC Air Filters for T. F. Green Airport
Term Contract
Results
Warwick, RI 02886

HVAC Water Treatment Chemicals, Service and Testing
Term Contract
Post-Bid
Cranston, RI

Radiator Manufacture and Repair
Term Contract
Results
Warwick, RI 02886

RISE Prep Mayoral Academy HVAC Maintenance Services
Post-Bid
Woonsocket, RI 02895

HVAC Upgrades
Results
$100,000 to $250,000 est. value
Newport, RI 02841

Boiler Plant 7CC Condensate System Repairs
Post-Bid
$500,000 to $1,000,000 est. value
Newport, RI 02841

Powers Building - HVAC Terminal Box Control Upgrade Phase II
Results
North Providence, RI 02908

Air Handler Unit Repairs
Post-Bid
$25,000 to $100,000 est. value
Newport, RI 02841

Heating, Ventilating and Air Conditioning (HVAC) Maintenance, Boiler, Burner Repair Services
Results
North Kingstown, RI 02852

North Kingstown High School Ac Improvements
Post-Bid
North Kingstown, RI 02852

Reported 08/26/2020 12:00 AM
Project Title

Springbrook Elementary School - Freezer Compressor and Evaporator Replacement

Physical Address View project details and contacts
City, State (County) Westerly, RI 02891   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 08/13/20
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and dispose of failed equipment 2. Recover refrigerant per EPA standards 3. Replace line set and install insulation as needed 4. Replace filter dryer 5. Replace with required levels refrigerant (R404A) 6. Place system in vacuum after brazing in compressors 7. System start-up and commissioning, ensure proper temperatures and operation 8. File required EPA paperwork/refrigerant tracking 9. Electrical disconnect/connect including any control wiring.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents