Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

High Desert Corridor - Los Angeles County Metropolitan Transportation Authority (LA Metro)
Alteration
Conception
$1,000,000,000 est. value
Palmdale, CA

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Merced Avenue Greenway Project
Infrastructure
Design
$10,274,688 CJ est. value
South El Monte, CA 91733

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Front Street Beautification
Infrastructure, Renovation
Bidding
$3,700,000 CJ est. value
Los Angeles, CA 90731

Well Pump Retrieval, Extraction, Video Log and 1 (New) Potable Deep Well Pump Bowl Assembly and Parts
Term Contract
Sub-Bidding
Pomona, CA 91766

Richmond Street Elementary School - New 2-Story Classroom Building
New Construction, Infrastructure - 5,500 SF
Post-Bid
$7,500,000 CJ est. value
El Segundo, CA 90245

Pump Station Recovery Mitigation Project
Renovation
Post-Bid
Long Beach, CA

Orchard Dale Elementary School Modernization Project- Sitework
Infrastructure
Results
Whittier, CA 90603

West Parcel Habitat Mitigation & Five Year Maintenance
Infrastructure
Results
$1,050,000 est. value
Walnut, CA 91789

West Gardena Boulevard Mixed Use
Demolition, New Construction, Infrastructure - 22,402 SF
Pending Verification
$6,000,000 CJ est. value
Gardena, CA 90247

Oxford Avenue Apartments
Demolition, New Construction, Infrastructure - 111,609 SF
Pending Verification
$23,000,000 CJ est. value
Los Angeles, CA 90006

Alameda Corridor Terminus Enhancements - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 est. value
Compton, CA 90222

Repair and Installation of Wet and Dry Utilities at Los Angeles International Airport and Van Nuys Airport
Infrastructure
Design
$920,704 CJ est. value
Los Angeles, CA 90012

Last Updated 07/22/2022 10:35 AM
Project Title

Submersible Pumps Installation for Sewer Pump Station - (Rebid)

Physical Address View project details and contacts
City, State (County) San Gabriel, CA 91776   (Los Angeles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $845,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: The work to be done consists of furnishing all necessary labor, tools, transportation, and other incidental and appurtenant work necessary to install three new Hayward Gordon 40 HP submersible chopper pumps with quick-disconnect pump guide rail supporting systems in the wet well, including all necessary material installation for piping and fitting connections in the wet well and dry well; removal of the two existing Gorman-Rupp pumps from the dry well; new conduits, new electrical wiring and all other necessary electrical connections from the new pumps to the new electrical control panel inside the dry well; and installation of the new liquid level pressure transducer and back-up float switch/liquid level pressure transducer for the new pumps. The new pumps shall be fully operational when the installation is completed. New submersible pumps will be provided by the City. The scope of work also includes the design and implementation of a new Supervisory Control and Data Acquisition (SCADA) system to enhance and improve the existing monitoring and operation control system. The work shall include the complete fabrication and installation of a new pump station control/SCADA panel with all necessary electrical equipment and material to replace the existing control panel. The contract is to be executed within 7 calendar days after award of contract by City Council. Time for completion of the work is thirty (30) working days from the actual start of the installation/construction of the project. There is no pre-bid meeting for the project. Bid Security: Each bid shall be accompanied by a certified or cashier's check, cash, or Bid Bond in the amount of ten percent (10%) of the total bid price payable to City of San Gabriel as a guarantee that the awarded bidder will execute the Contract and provide the required bonds, certificates of insurance, and endorsements within 7 calendars days of the of the award of contract by City Council. Questions: All questions relative to this project prior to the opening of bids shall be in writing or email and received no later than 4:00 p.m. on Wednesday, June 1, 2022 and shall be directed to: Project Manager, Alan Mai, at email: amai@sgch.org. Award of Contract: The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids, as it may best serve the interest of the City. The Bidder shall guarantee the Total Bid Price for a period of 90 calendar days from the date of bid opening.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents