Similar Projects
Drinking Water Distribution System Replacement Project
Term Contract
Bidding
Bly, OR

2022 Waterline Replacement Project
Infrastructure
Bidding
Gresham, OR

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Post-Bid
$2,600,000 to $2,900,000 est. value
Boardman, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Awbrey Butte Distribution Improvements
Alteration
Results
Bend, OR

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

Washington Way Advanced Utilities
Alteration
Post-Bid
Corvallis, OR 97333

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Brass Corporation Bends
Term Contract
Post-Bid
Salem, OR

Water Transmission Pipeline
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

Brass Meter Adapters
Term Contract
Post-Bid
Salem, OR

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

SW Roy Rogers Road - Chicken Creek to SW Borchers Dr
Alteration
Results
$15,000,000 to $20,000,000 est. value
OR

Last Updated 03/17/2022 04:28 PM
Project Title

Silver Creek Raw Water Line Installation Project

Physical Address View project details and contacts
City, State (County) Silverton, OR 97381   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of demolition of the existing intake facility, construction of a new water intake and pumping facility including electrical and mechanical improvements, replacement of the existing raw water supply pipeline, trenchless pipe rehabilitation of a section of pipeline, site restoration and planting, and work area isolation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents