Similar Projects
Mill and Overlay - CSAH 9 (Woodland Avenue) - CP 0009-382898
Infrastructure
Conception
$800,000 est. value
Duluth, MN 55802

Mill and Overlay - CSAH 37 - CP 0037-466143
Infrastructure
Conception
$300,000 est. value
Duluth, MN 55802

Patricia Zakovec Impoundment Water Control Structure
Renovation, Infrastructure
Design
$170,980 CJ est. value
Toivola, MN 55765

2021 Paving
Post-Bid
Hibbing, MN

North Smoky Hills Graveling
Renovation
Post-Bid

Grading and Bituminous Surfacing
Results
MN

Reclaim and Overlay
Results
MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Road Construction - CSAH 7 - CP 0007-395054
Infrastructure
Conception
$2,000,000 est. value
MN

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Woodland Park and Ride Refurbishment
Results
$90,000 est. value
Duluth, MN 55803

E 4th St. Apartment Building
Renovation, Infrastructure
Pending Verification
Less than $1,100,000 est. value
Duluth, MN 55805

Mill and Overlay
Infrastructure
Conception
Less than $2,100,000 est. value
Duluth, MN 55802

Canosia WMA Gravel Dump and Spread
Post-Bid
Duluth, MN 55811

Last Updated 08/30/2022 05:35 PM
Project Title

RFP D/B - Engineering Services for 1st Avenue East (Superior Street to 3rd Street)

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Duluth is interested in retaining a consultant to provide design and construction services for the reconstruction of 1st Avenue East from Superior Street to 3rd Street. In addition to street improvements, the existing 6" watermain will be replaced with 8" HDPE main from Superior Street to Second Street (approximately 700 feet). Water improvements will include replacement of any lead services. Existing copper services will be reconnected to the new main as the alignment allows. The sanitary sewer has not been lined but will remain in place. It is anticipated that any clay tile sanitary laterals will be replaced from the main to the right of way line within this project. Storm sewer will be replaced as necessary to facilitate the street construction. A hydraulic analysis of local road drainage will be required, and additional catch basins will most likely be needed to capture runoff from the 10-year storm design. A stormwater quality structure will not be installed along this route as a sedimentation basin is already located below the freeway. In addition to the above improvements, Duluth Energy Systems will also be installing hot water and steam lines from Superior Street to the 3rd Street alley to connect the Old Central High School. It is anticipated that Evergreen Energy will prepare the construction documents for these facilities for incorporation into the City plan set. The consultant will be required to coordinate with Evergreen to incorporate these plans and prevent utility conflicts. There is an existing street lighting system on the brick sections of 1st Ave E, between Superior Street and the 2nd St alley. It is anticipated that this lighting system will be replaced with the same street lighting system as Downtown Superior Street. In addition, the signal system at 2nd Street and 1st Ave E should be analyzed for warrants. Consultants should plan to replace this system in their proposals, as there are sight distance concerns at this location that may require that the signal remain. The signal at 1st Ave E and 1st Street has already been removed. The signal at 3rd Street and 1st Ave E is currently planned for removal as part of the 3rd Street project. Consultants should plan to design and install a fiber optic interconnect between Superior Street and 3rd Street as part of the project. Design and construction efforts will have to be coordinated with design and construction work occurring for the Third Street reconditioning project, from Mesaba Ave to 12th Ave E. The Third Street project will address the intersection at Third and 1st Ave E, as well as the ADA improvements. The 1st Ave E project will tie in to that project. The 3rd St project has the 90% plans due on 1/2/23, with bidding in February, for a summer 2023 construction season. The Consultant shall provide full-time construction inspection services. The proposal shall be based upon 20 weeks of construction and a total of 60 hours per week of inspection. August 30, 2022 Question Submission Deadline September 2, 2022 Questions Answered via Addendum April 24, 2023 Award Construction Contract May 15, 2023 Start Construction September 29, 2023 Construction Completion February, 2024 Submittal of record drawings. All questions concerning the project shall be directed to: Patrick Loomis, PE, Project Engineer City of Duluth - Engineering Division 411 W. 1st Street, Room 211 City Hall Duluth, Minnesota 55802-1191 ploomis@duluthmn.gov (218) 730-5094 The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents