Similar Projects
HVAC Services
Term Contract
Post-Bid
$16,900 est. value
Bethlehem, PA 18018

HVAC and Mechanical Products
Term Contract
Post-Bid

Addition and Alterations to Municipal Complex, Contract No. 4 - HVAC Construction Contract
Results
Less than $1,260,000 est. value
Allentown, PA 18104

Replace Data Center HVAC System at Lehigh County Government Center
Results
Allentown, PA 18101

Air Filters
Results
Allentown, PA 18103

Lehigh County Jail Add Air Conditioning to Pod 4A
Results
Allentown, PA 18102

Whitehall Township Municipal Improvements - HVAC Construction
Results
Less than $1,462,693 est. value
Whitehall, PA

Split System Chiller and Pump Replacements at the Eyer Middle School
Results
Macungie, PA 18062

Whitehall Football Stadium Improvements - HVAC Construction
Results
Whitehall, PA 18052

Chiller Corrosion Protection Project
Results
Allentown, PA

Replace Furnaces at 117 Apartments at Lynfield
Results
Less than $175,000 est. value
Bethlehem, PA 18017

HVAC Replacement
Results
Allentown, PA 18102

Replace HVAC Equipment - Phase 2
Results
Fountain Hill, PA 18015

Cooling Tower Fan Blade Replacement Project
Results
Allentown, PA 18101

HVAC Equipment Maintenance
Results
Allentown, PA 18104

Last Updated 08/20/2020 11:44 AM
Project Title

Parkland Bus Storage Building - HVAC Construction

Physical Address View project details and contacts
City, State (County) Orefield, PA 18069   (Lehigh County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $61,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site clearing, site demolition, site work, utility service work, street / road work, concrete, masonry, structural metal framing, carpentry, interior woodwork, insulation, flashing, metal doors and frames, wood doors, access doors, coiling overhead doors, aluminum storefront, door hardware, glazing, non-structural metal framing, gypsum board, tile, acoustical ceilings, resilient flooring, carpeting, painting, specialties, metal building components including: structural metal framing, metal framing sub-components, metal siding, metal roofing, thermal insulation, electric, plumbing/fire protection, and mechanical work for the construction of the Parkland School District Bus Storage Building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents