Similar Projects
Milling and Resurfacing -Add Nb Lane Off Ramp Sample Rd / Tpk Intchng (Sr 91 Mp69)
Infrastructure
Bidding
$1,701,283 est. value
FL

MTC Courtyard Partial Brick Paver Replacement
Infrastructure
Bidding
Miramar, FL 33025

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

Broward MPO Regional Complete Streets Initiative
Results
FL

Dominos # 5082-2
Alteration
Construction
Plantation, FL 33324

Hiatus Road - McNab Road Roundabout
Infrastructure
Bidding
Tamarac, FL 33309

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Undergrounding of Overhead Utilities and Streetscape
Results
Less than $10,000,000 est. value
Hollywood, FL 33022

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Results
Less than $26,400,000 est. value
FL

Accessways and Driveways Construction Services, Roadway Maintenance Services, and Drainage Services
Renovation
Post-Bid
Hollywood, FL

Asphalt Resurfacing of Linear Park Walking Path
Results
Less than $36,263 est. value
Pembroke Pines, FL 33026

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Last Updated 12/09/2021 12:45 AM
Project Title

Bike Path/Trail/Milling and Resurfacing/Roadway Widening/Base Work - SW 184th Ave

Physical Address View project details and contacts
City, State (County) FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,430,820
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements under this contract consist of roadway widening and shared-use pathway construction, including, but not limited to, monitor existing structures (inspection and settlement, vibration), concrete (removal, curb and gutter, sidewalk and driveways), signing (single post), pavement markings (detectable warnings, raised markings, painted, thermoplastic, bike lane), signalization (conduit, cable, pull/splice, aluminum pole, pedestrian signals and detectors, controller-modify), tree disposition (protection, root and branch pruning), drainage (inlets, pipe culvert), and sod along SW 184th Ave Section 0001 Roadway 0101- 1- Mobilization (44157915201) Ls 1.000 0102- 1- Maintenance of Traffic (44157915201) Ls 1.000 0102- 14- Traffic Control Officer Hr 112.000 0102- 60- Work Zone Sign Ed 3,482.000 0102- 71- 16 Temporary Barrier, F&i, Free Standing Lf 2,850.000 0102- 71- 26 Temporary Barrier, Relocate, Free Standing Lf 6,667.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, or Lcd Ed 3,457.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 9,243.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 117.000 0102- 89- 1 Temporary Crash Cushion, Redirective Option Lo 5.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 14.000 0102-104- Temporary Signalization and Maintenance, Intersection Ed 567.000 0102-107- 1 Temporary Traffic Detection and Maintenance, Intersection Ed 567.000 0104- 10- 3 Sediment Barrier Lf 12,152.000 0104- 18- Inlet Protection System Ea 19.000 0108- 1- Monitor Existing Structures- Inspection and Settlement Monitoring (44157915201) Ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring (44157915201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44157915201) Ls 1.000 0110- 4- 10 Removal of Existing Concrete Sy 462.000 0110- 21- Tree Protection Barrier Lf 3,896.000 0110- 22- Tree Root and Branch Pruning Ea 51.000 0120- 1- Regular Excavation Cy 2,867.200 0120- 6- Embankment Cy 215.100 0160- 4- Type B Stabilization Sy 12,189.000 0285-704- Optional Base, Base Group 04 Sy 2,931.000 0285-711- Optional Base, Base Group 11 Sy 5,492.000 0327- 70- 12 Milling Existing Asphalt Pavement, 1 1/4" Avg Depth Sy 14,046.000 0334- 1- 11 Superpave Asphaltic Conc, Traffic a Tn 226.700 0334- 1- 13 Superpave Asphaltic Conc, Traffic C Tn 689.100 0337- 7- 82 Asphalt Concrete Friction Course,traffic C, Fc-9.5, Pg 76- 22 Tn 970.500 0425- 1-521 Inlets, Dt Bot, Type C,<10' Ea 2.000 0430-175-115 Pipe Culvert,optional Material,round, 15"S/cd Lf 7.000 0520- 1- 10 Concrete Curb & Gutter, Type F Lf 436.000 0522- 2- Concrete Sidewalk and Driveways, 6" Thick Sy 405.000 0527- 2- Detectable Warnings Sf 251.000 0570- 1- 2 Performance Turf, Sod Sy 4,611.000 0999- 25- Initial Contingency Amount, Do Not Bid (44157915201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, F&i Ground Mount, Up to 12 Sf as 12.000 0700- 1- 60 Single Post Sign, Remove as 5.000 0706- 1- 3 Raised Pavement Marker, Type B Ea 112.000 0710- 90- Painted Pavement Markings, Final Surface (44157915201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" for Crosswalk And Roundabout Lf 2,313.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Line And Crosswalk Lf 256.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 0.257 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 12.000 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" for Crosswalk Lf 190.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 17.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 17.000 0711- 16-101 Thermoplastic, Standard-other Surfaces, White, Solid, 6" Gm 3.914 0920-714- 45 Green Colored Pavement Markings, Bike Lane, Project 441579-1-52-01 Sf 3,023.000 Section 0003 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 340.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 665.000 0632- 7- 1 Signal Cable- New or Reconstructed Intersection, Furnish & Install Pi 3.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 26.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 11.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 10.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 1.000 0653- 1- 60 Pedestrian Signal, Remove Ped Signal- Pole/pedestal to Remain As 12.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 12.000 0665- 1- 60 Pedestrian Detector, Remove- Pole/pedestal to Remain Ea 12.000 0670- 5-400 Traffic Controller Assembly, Modify as 3.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents