Similar Projects
Bridge Deck Overlay
Infrastructure
Conception
$1,741,840 est. value
Rising Sun, IN 47040

Bridge Deck Overlay
Infrastructure
Conception
$1,741,840 est. value
Rising Sun, IN 47040

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$3,380,000 est. value
Bloomfield, IN 47424

Bridge Painting
Renovation
Design
$281,654 est. value
Anderson, IN 46012

Small Structure Replace, Bridge Rehab and Pavement Patching
Renovation, Infrastructure
Bidding
$1,739,258 est. value
Lizton, IN

Small Structure Replace, Bridge Rehab and Pavement Patching
Renovation, Infrastructure
Bidding
$1,739,258 est. value
Lizton, IN

Hendricks County Bridge 84 Replacement
Post-Bid
IN

2021 Community Crossings Grant Funded Street Paving
Post-Bid
Sellersburg, IN

Asphalt Resurface
Results
IN

Bridge Deck Overlay
Results
Indianapolis, IN 46200

Intersection Improvements With Added Turn Lanes
Infrastructure
Design
$1,001,799 est. value
Columbus, IN 47202

Bridge Joint Repair CR 925 E over Eel River Cass County Bridge No. 116
Renovation, Infrastructure
Bidding
$700,000 est. value
Logansport, IN 46947

Asphalt Milling and Resurfacing on Various Streets
Post-Bid
Rockville, IN

Coldwater Road Greenscape - Cook Road to Till Road
Results
Fort Wayne, IN 46800

Bridge Deck Overlay
Renovation, Infrastructure
Bidding
$446,491 est. value
Greencastle, IN 46135

Reported 07/01/2022 04:09 PM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Lynnville, IN 47619   (Warrick County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $2,011,226
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Lynnville, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Over Simpson Branch, 2.33 miles E of SR-61 As of June 30, 2022, the project is in Conceptual status. Anticipated letting date is November 16, 2022. INDOT - Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents