Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Storcon Self-Storage Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

Construction Services for the Bill Beck Boulevard Extension Project
Infrastructure
Results
$7,939,380 est. value
Kissimmee, FL 34744

Downtown Revitalization Project Phase II
Infrastructure
Results
$6,000,000 est. value
Saint Cloud, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Encompass Health Rehabilitation Hospital of Kissimmee Phase 1
New Construction, Infrastructure - 52,470 SF
Construction
$35,000,000 CJ est. value
Kissimmee, FL 34746

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Cyrils Drive Widening from Narcoossee to Absher - County Of Osceola -
Infrastructure
Conception
$5,000,000 est. value
Saint Cloud, FL 34771

Osceola Village Center Daybreak Market
New Construction, Infrastructure - 4,800 SF
Design
Kissimmee, FL 34741

Imprint Senior Living Community / Saint Cloud
New Construction, Infrastructure - 58,214 SF
Post-Bid
$30,000,000 CJ est. value
Saint Cloud, FL 34772

Last Updated 05/30/2023 02:08 PM
Project Title

RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St )

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34744   (Osceola County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $19,396,191 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 30, 2023, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 05 Selection Method : Letter of Response and Interview Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) TRC Members (Subject to Change) : Gabor Chiorean Heidi Trivett Will Isidort Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) - This Project Will Resurface This Segment of U.s. 192 to Extend the Life of the Existing Roadway. The Project Also Will Widen the Existing Bicycle Lane to a 6-foot-wide Buffered Bicycle Lane in Each Direction to Improve Safety for Bicyclists. Other Operational Improvements Include Extending Left Turn Lanes, Reconstructing Some Existing Median and Corner Curbs, and Upgrades to Traffic Signals. Pedestrian Safety Enhancements Include Adding New Pedestrian Crossings at the I-95 Interchange, as Well as New and Upgraded Crosswalks Throughout the Project Limits. The Project Also Will Reconstruct Pedestrian Curb Ramps to Current Americans With Disabilities Act (Ada) Standards and Upgrade Pedestrian Signals. Drainage and Lighting Improvements Are Also Planned. Financial Management Number(s) 447094-1 Shortlist Selection Date/Time 9/20/2021 Technical Review Committee Meeting 1 Date/Time 10/05/2021 Technical Review Committee Meeting 2 Date/Time 10/05/2021 Technical Review Committee Meeting 3 Date/Time 10/06/2021 Final Selection Date/Time 10/18/2021 07:00 pm Negotiations Period Begin Date 10/22/2021 Negotiations Period Ending Date 11/24/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St )

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents