Similar Projects
Last Updated | 05/30/2023 02:08 PM |
Project Title | RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St ) |
Physical Address | View project details and contacts |
City, State (County) | Kissimmee, FL 34744 (Osceola County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $19,396,191 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 30, 2023, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 05 Selection Method : Letter of Response and Interview Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) TRC Members (Subject to Change) : Gabor Chiorean Heidi Trivett Will Isidort Sr 500 / Us 192 From I-95 to Sr 507 ( Babcock St ) - This Project Will Resurface This Segment of U.s. 192 to Extend the Life of the Existing Roadway. The Project Also Will Widen the Existing Bicycle Lane to a 6-foot-wide Buffered Bicycle Lane in Each Direction to Improve Safety for Bicyclists. Other Operational Improvements Include Extending Left Turn Lanes, Reconstructing Some Existing Median and Corner Curbs, and Upgrades to Traffic Signals. Pedestrian Safety Enhancements Include Adding New Pedestrian Crossings at the I-95 Interchange, as Well as New and Upgraded Crosswalks Throughout the Project Limits. The Project Also Will Reconstruct Pedestrian Curb Ramps to Current Americans With Disabilities Act (Ada) Standards and Upgrade Pedestrian Signals. Drainage and Lighting Improvements Are Also Planned. Financial Management Number(s) 447094-1 Shortlist Selection Date/Time 9/20/2021 Technical Review Committee Meeting 1 Date/Time 10/05/2021 Technical Review Committee Meeting 2 Date/Time 10/05/2021 Technical Review Committee Meeting 3 Date/Time 10/06/2021 Final Selection Date/Time 10/18/2021 07:00 pm Negotiations Period Begin Date 10/22/2021 Negotiations Period Ending Date 11/24/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 500 / US 192 From I-95 to SR 507 ( Babcock St ) |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |