Similar Projects
RWCC Water Storage Tank Replacement
Term Contract
Design

Annual Aboveground Storage Tank (AST) Inspections
Term Contract
Design
Baltimore, Perry Point, MD 21201

Windmill Pump Station Replacement
New Construction
Bidding
Easton, MD

Water Storage Tower Painting and Repair
Infrastructure
Bidding
MD

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Cliffton Water System Improvements - Elevated Storage Tank
Results
Newburg, MD 20664

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Water Tower Improvements (Bulle Rock)
Infrastructure
Bidding
Havre de Grace, MD

Design Build Water Tower Repairs
Post-Bid
Germantown, MD 20874

Ballast Tank Preservation
Results
Baltimore, MD

Bonnie Brook Water Facilities Upgrade
Infrastructure
Post-Bid
Cambridge, MD

World-Wide Water Storage Tank Remediation
Term Contract
Results

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

Primary Settling Tanks Nos. 3 & 4 Rehabilitation at the Back River WasteWater Treatment Plant
Results
$15,000,000 to $20,000,000 est. value
Baltimore, MD 21224

Last Updated 02/18/2022 07:46 AM
Project Title

Sparks Water Pumping Station and Elevated Tank Improvements

Physical Address View project details and contacts
City, State (County) Towson, MD   (Baltimore County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,377,702
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide a fully finished and operable pumping station facility including miscellaneous items and operations. The work also includes all specified, indicated and shown civil site work, plumbing, structural, mechanical and electrical equipment, appliances, appurtenances, furnishings, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation. Sparks–District 8c3.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents