Similar Projects
MetraPark Expansion
Addition
Conception
Billings, MT 59101

Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Maintenance, Alteration, and Repair Services (MARS)
New Construction
Design
Rockville, MD - Hamilton, MT 20852

Wolf Point Solid Waste Building
New Construction - 4,000 SF
Bidding
$10,000,000 est. value
Wolf Point, MT

Civic Center Human Resources Tenant Improvement
Renovation
Bidding
$550,000 est. value
Great Falls, MT 59401

Big Springs Trout Hatchery Residence Replacement
Renovation
Post-Bid
$308,000 est. value
Lewistown, MT

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Construction of a New Transit facility
New Construction - 3,360 SF
Results
Livingston, MT

Deer Lodge Sand Salt Cover Structure
New Construction
Results

Big Horn Industries Exterior Upgrades and Little Big Horn Center Interior Remodel
Renovation
Bidding
$1,300,000 est. value
Hardin, MT

FTH HAFRC VA & VFW Remodel
Renovation
Post-Bid
Fort Harrison, MT

NIH Multiple Award Task Order Contract (MATOC) for Construction Services
New Construction
Post-Bid
Baltimore, Bethesda, Gaithersburg, Poolesville, Rockville, MD - Hamilton, MT - Durham, NC

Facility Maintenance IDIQ for Construction
Renovation
Post-Bid
$100,000 to $250,000 est. value

Reservation-Wide Transfer Stations Improvements
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Wyola, MT 59089

Interior/Exterior Remodel, Six (6) Plex Building 4A
Renovation
Post-Bid
$210,000 est. value
Great Falls, MT 59405

Reported 06/14/2022 12:00 AM
Project Title

Anaconda Job Corps Center Multi-Building Rehab

Physical Address View project details and contacts
City, State (County) Anaconda, MT 59711   (Deer Lodge County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work for this Project consists of Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: Various HVAC and fire suppression related life safety work items in multiple

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents