Similar Projects
Saratoga Springs Foothill Boulevard Extension-Lariat to Pony Express Parkway
Infrastructure
Bidding
Saratoga Springs, UT 84045

Lehi City Slurry Seal
Infrastructure
Bidding
Lehi, UT

2021 Provo City Streets Road Rehabilitation
Post-Bid
Provo, UT

2021 Roads Project
Post-Bid
Lehi, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

2020 Road Maintenance Projects
Results
Less than $46,601 est. value
Saratoga Springs, UT

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

Sierra Vista Way Extension Project
Infrastructure
Bidding
Provo, UT 84606

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

2020 Manhole Collar Repair Project
Results
Less than $104,650 est. value
Saratoga Springs, UT

2022 Eagle Mountain Slurry Seal
Infrastructure
Bidding
Eagle Mountain, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

700 South Overlay Project
Results
Less than $300,000 est. value
Pleasant Grove, UT 84062

2022 Road Maintenance Projects
Infrastructure
Bidding
Saratoga Springs, UT

Reported 03/23/2022 12:00 AM
Project Title

2022 Roadway Project

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,500,000 to $2,800,000
Plans Available from Municipal Agency - 02/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes 102,600 SY of 1 1/2” edge mill with 2” overlay, 8,550 SY of Roadway Excavation and Roadway Reconstruction, 33,500 SY of 1” leveling course, 26 modified ADA ramps, 24 ADA ramps, 300 utility manholes/water valves brought to finished grade with concrete collars, 6 existing monuments brought to finished grade, 200 LF of 2’ curb and gutter, 200 SF of concrete flatwork, 40 LF of concrete drive approach, 7 storm drain structures, and 45’ of 12” and 15” SDR35 PVC pipe.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents