Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

LLBO Construction Industry Workforce Training Facility
New Construction
Conception
Duluth, Grand Rapids, Minneapolis, MN

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

RFQ - Architectural and Engineering Services
Term Contract
Bidding
Richfield, MN 55423

Hennepin County Government Center HVAC Rehabilitation
Renovation
Sub-Bidding
$17,370,500 CJ est. value
Minneapolis, MN 55487

Construction Coordinator Services
Term Contract
Sub-Bidding
Minneapolis, MN 55415

2021 Rogers HS and Zimmerman MS / HS Stadium Electrical
Post-Bid
Rogers, Zimmerman, MN 55374

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

CDBG 2021 - Consolidated Pool
Results
MN

New Hope Public Works Facility Phase 1 Improvements
Renovation
Construction
Minneapolis, MN 55428

MN Valley ES Addition
New Construction, Renovation, Addition
Construction
$1,000,000 to $5,000,000 est. value
Minneapolis, MN 55437

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid
$1,500,000 est. value

USPS IQ JOC Minnesota
Renovation
Results

Bde Maka Ska Pavilion - Minneapolis Park and Recreation Board
New Construction
Construction
$150,000 est. value
Minneapolis, MN 55467

Last Updated 08/01/2022 04:09 PM
Project Title

City Center 2022 LED Lighting Retrofit

Physical Address View project details and contacts
City, State (County) Eden Prairie, MN 55344   (Hennepin County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Electric, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $89,400 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the project at the City Center for replacement of the existing light fixtures with LED light fixtures. Work for this project includes: replacement of the existing light fixtures with new Owner provided LED light fixtures. Prevailing wage laws apply to this project. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, Section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The City of Eden Prairie reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the contract(s) in the best interests of the City. No bids may be withdrawn for a period of 60 days after opening of bids.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents