Similar Projects
South College Avenue Stormwater Detention Facility Construction
Infrastructure
Conception
$417,000 est. value
Bryan, TX

SAWS E-54 Sewer Project
New Construction
Bidding
$35,000,000 est. value
San Antonio, TX 78212

Sanctuary Pump Station
New Construction
Bidding
$400,000 est. value
TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Stormwater Pump Station Pump Replacement
Post-Bid
Sugar Land, TX 77479

Ratcliff Lake Lift Station Repairs
Results
$25,000 to $100,000 est. value
Ratcliff, TX

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Bird Creek Basin Wastewater Projects
New Construction
Pending Verification
$5,400,000 est. value
Temple, TX

Major Rehabilitation of Raw Water Facilities
Infrastructure
Bidding
Dallas, TX

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Newport Pointe Lift Station Phase 1
Results
TX

2020 - FM 1331 Pump Station Project
New Construction
Construction
$7,848,040 est. value
Hutto, TX

Munn Lift Station Reconstruction
Infrastructure
Bidding
$1,320,000 est. value
Boyd, TX

Last Updated 03/28/2022 10:15 AM
Project Title

Eagle Mountain and Westside Water Treatment Plant Weatherproof Enclosures

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project consists of constructing two (2) pre-engineered metal buildings to enclose and provide weatherproofing for two existing Water Treatment Plant High Service Pump Stations and one (1) concrete masonry unit building to enclose and provide weatherproofing for one existing Water Treatment Plan High Service Pump Station.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents