Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Spring Creek Interceptor Phase 2 - 34-P05 - City of Plano
Alteration
Conception
$9,000,000 est. value
Plano, TX

Legacy Frontier Apartments
New Construction, Infrastructure - 249,016 SF
Design
$55,000,000 CJ est. value
Celina, TX 75078

Everest Stone Showroom and Warehouse
New Construction, Infrastructure - 7,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75229

Riverfield, Phases 2, 3, and 4 Earthwork Improvements
Infrastructure
Bidding
$4,460,810 CJ est. value
Josephine, TX 75164

The Construction of McKinney Sports Complex
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
McKinney, TX 75070

The Grace at Creekside
New Construction, Infrastructure - 250,126 SF
Sub-Bidding
$37,300,000 CJ est. value
Dallas, TX 75237

Lincoln Fairview
New Construction, Infrastructure
Sub-Bidding
$58,000,000 CJ est. value
Fairview, TX 75069

Advanced Metering Infrastructure (AMI) System
Post-Bid
McKinney, TX

Travis Ranch Phase 2K Utility Improvements
Post-Bid
Dallas, TX

Trinity Falls East Feed Waterline and Mclarry 36 inch Waterline
Results
McKinney, TX

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Village 121 Site Work
New Construction
Construction
Plano, TX 75024

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Dutch Bros Coffee - TX3401 / McKinney
New Construction, Infrastructure - 950 SF
Pending Verification
$950,000 CJ est. value
McKinney, TX 75071

Last Updated 08/08/2022 10:34 AM
Project Title

Copeville Special Utility District - 8 inch Waterline Improvements Project - CR 546

Physical Address View project details and contacts
City, State (County) Nevada, TX 75173   (Collin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $267,189 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A pre-bid conference will not be held. Bid security shall be furnished in accordance with the Instructions to Bidders. This work consists of constructing water mains and service branches, including fire hydrants, water meters, service stops, valves, fittings and boxes. The CONTRACTOR shall provide all tools and equipment required for installing these items. The work also includes furnishing all materials, excavating, bedding, laying pipe, jointing, backfilling, hydrostatic testing, disinfection, restoration of disturbed facilities and surfaces, line (location) and grade, disposal of all surplus excavation and discarded materials, and other work necessary to complete the items. In the event of a conflict between this specification and the project plans (drawings) then the plans will take precedence.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents