Similar Projects
York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Bidding
Bensenville, IL 60106

Main Street and Organ Street Pumping Station Rehabilitations
Renovation
Bidding
Eldorado, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Utilities Lift Station Pump Replacements 2021
Bidding
Joliet, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

Chasemoor Lift Station Rehabilitation
Renovation
Bidding
Burr Ridge, IL 60527

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Various Repairs at Pavilion Lift Station
Results
Oakwood, IL 61858

Last Updated 03/31/2021 11:29 AM
Project Title

Hidden Ridge Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Highland Park, IL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of demolition and installation of: pumps, pump controls, SCADA, electrical gear, and generator, wet well cover with access hatches, and cathodic protection system, along with coating of the wet well piping and valve vault piping. The Contractor shall be responsible for controlling and maintaining all sanitary flows within the sewer system and lift station during the length of the project. All equipment will be tested in the presence of the Owner and Engineer to make sure it is functioning properly. The Contractor shall be responsible for maintaining traffic control and residential access during the project.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents