Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Results
$600,000 to $700,000 est. value
Oroville, WA

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Lower Pine Street Improvements
Infrastructure
Results
$330,000 est. value
Okanogan, WA

Relocate Runway Connector and Construct West Taxilane
Infrastructure
Post-Bid
$436,000 est. value
Brewster, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Engh Road - SR 215/US 97 Intersection Improvements
Infrastructure
Post-Bid
$425,000 est. value
Omak, WA 98841

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Sitework - Portable Foundation (Structural Drawings)
Infrastructure
Post-Bid
$200,000 est. value
Okanogan, WA

Carlton AF Domestic Well
Infrastructure
Post-Bid
$275,000 CJ est. value
Twisp, WA 98856

Last Updated 12/21/2022 07:01 AM
Project Title

6th Street Improvements Project

Physical Address View project details and contacts
City, State (County) Coulee Dam, WA 99116   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $661,391 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to 6th Street from Aspen Street to Central Drive. Work includes approximately 5,330 square yards of full depth reclamation with cement treated base, 180 cubic yards of roadway excavation, 846 tons of asphalt paving, retrofitting 24 ADA ramps, 284 linear feet of concrete curb, 1,292 linear feet of concrete curb and gutter, 852 linear feet of reinforced concrete valley gutter, storm drainage improvements, pavement markings, erosion and sediment control, traffic control and other miscellaneous work. The bid opening will take place at the Town of Coulee Dam, Town Hall, 300 Lincoln Avenue, Coulee Dam, WA 99116. Proposals received after the time fixed for opening will not be considered. Bids must be completed on a lump sum and unit price basis as indicated on the BID PROPOSAL, and the total price shall be used for comparison of bids. The owner reserves the right to waive any informalities, minor defects, or to reject any or all bids. Estimated Cost of Project: $600,000 - $635,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents