Similar Projects
Y1DZ--Chiller Plant construction-Erie VAMC Project Number 562-14-115
Design
$5,000,000 to $10,000,000 est. value
Erie, PA

Pleasant Ridge Park Water Treatment Building Construction Project
New Construction
Bidding
Girard, PA 16417

Secondary Clarifier Catwalk Repair
Addition
Bidding
Oaks, PA

Construction of the Loysville Inflow and Infiltration Project
Post-Bid
Loysville, PA 17047

Glendale Valley Municipal Authority Dutch Run Oval Wastewater Extension
Post-Bid
Flinton, PA 16640

Water Treatment Improvements Project - General/Mechanical
Results
Less than $1,318,898 est. value
Williamsburg, PA

Supply and Delivery of Soda Ash to the Goose Creek and Taylor Run Wastewater Treatment Plants
Term Contract
Results
$76,746 est. value
West Chester, PA 19382

Wastewater Treatment Plant Improvements
Renovation
Construction
Pocono Lake, PA 18347

Pretreatment Building Restoration at Queen Lane WTP
Renovation
Construction
$5,000,000 est. value
Philadelphia, PA 19129

Rock Run Water Treatment Plant Renovation
Renovation
Bidding
Coatesville, PA 19320

2020 Independence Park Water Treatment Plant Upgrade
New Construction - 300 SF
Post-Bid
Less than $500,000 CJ est. value
Clinton, PA 15026

Centre Hall/Potter Wastewater System Improvement Project (General)
Results
Centre Hall, PA 16828

Allegheny National Forest - Wastewater Treatment Plant Operation
Post-Bid
Bradford, PA 16701

Water Filteration Plant Painting Phase III - Raw Water Pump Area
Term Contract
Results
Allentown, PA 18102

Wastewater Treatment Plant Expansion Project
Post-Bid
Mars, PA 16046

Last Updated 06/11/2021 06:06 PM
Project Title

Wastewater Treatment Plant Upgrade - General Construction

Physical Address View project details and contacts
City, State (County) Halifax, PA 17032   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of a new 0.28 MGD Sequencing Batch Reactor Wastewater Treatment Plant including Influent Pump Station, Bar Screen, Ultra-Violet Disinfection, Headworks Building, Blower and UV Building and rehabilitation of existing treatment tanks into sludge holding tanks. 1. Remaining work not identified as work under other contracts 2. Development and maintenance of the construction schedule. 3. Site preparation, including clearing, building and tank demolition and relocations, and earthwork. 4. Site improvements, including roadways, parking lots, pedestrian paving, site development furnishings and equipment, and landscaping. 5. Selective demolition. 6. Foundations, including footings, and foundation walls. 7. Slabs-on-grade, including earthwork, subdrainage systems, and insulation 8. Emergency generator concrete pad. 9. Below-grade building construction, including excavation, backfill, and thermal and moisture protection 10. Superstructure, including floor and roof construction 11. Exterior closure, including walls, parapets, doors, windows, and louvers. 12. Roofing, including coverings, flashings and roof specialties. Roofing contractor responsible for roofing portion of work after curbs are installed by other trades 13. Interior construction, including partitions, doors, interior glazed openings, and fittings 14. Fire-protection specialties (Fire extinguishers) 15. Stairs, including railings and finishes. 16. Interior finishes 17. Miscellaneous items, including patching , concrete equipment bases and painting of mechanical and electrical work. 18. Process Equipment 19. Systems Integration 20. Furnishings. 21. SBR Tanks 22. Site water and utility supply and distribution 23. Site storm drainage. 24. Stormwater management.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents