Last Updated | 08/26/2020 08:59 AM |
Project Title | Chiller at Northside Prep |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60625 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Evacuate and dispose of existing freon. Remove and disconnect four compressors for two circuits. Crane to be provided to remove old compressor and bring new compressor onto roof. (Crane to be located on south end of school near chillers). Provide labor material to install for OEM compressors. Replace and remove 8 dryer cores, 4 contactors, 4 oil filters, and 2 pressor safety switches. Perform leak checks and repair any solderable leaks. Place vacuum on system. Charge with approximately 680 pounds of R22 refrigerant. Test operations and leave area clean and orderly. Contractor to secure necessary permits. Contractor to field verify dimensions and specifics of all before placing bid. Not responsible for contractor errors as a result of none field verification. Material and instillation must comply with cps standards and specifications 23.05.13 Common Motor Requirements for HVAC equipment. If building or CPS properties are damage during construction, contractor to replace and or repair as necessary. All questions/request must be received two business prior to bid closing. All work shall be coordinated with the board authorize representative to complete in a greed upon time frame. Contractor crew is to remove and dispose of materials torn out and any construction debris. All trash must be roved off-sight by vendor and area left clean. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |