Similar Projects
RFQ D/B - West 388th/419th Fighter Wing Apron at Hill Air Force Base
Term Contract, Infrastructure
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

RFQ D/B - West 388th/419th Fighter Wing Apron at Hill Air Force Base
Term Contract, Infrastructure
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

River Bottom Improvement Project Prequalification
Post-Bid

Clearfield Station Tod Infrastructure Project
Infrastructure
Post-Bid
Clearfield, UT 84015

Secondary Water Transmission Line and Street Reconstruction
Results
North Salt Lake, UT 84054

Train Watch Park Prv Improvement Project
Alteration
Results
$94,500 est. value
Clearfield, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Miscellaneous Concrete Replacement
Infrastructure
Bidding
$200,000 CJ est. value
West Bountiful, UT 84087

1500 South Waterline
Infrastructure
Post-Bid
Woods Cross, UT

500 West Water and Sewer Line Construction Project
Infrastructure
Results
$427,114 est. value
Clearfield, UT 84015

Hill Air Force Base Museum Expansion / HAFB
New Construction, Infrastructure - 87,000 SF
Bidding
$49,000,000 CJ est. value
Clearfield, UT 84015

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

2021 Water Line Projects
Infrastructure
Results
$1,765,214 est. value
Bountiful, UT

Syracuse City Corporation Secondary Reservoir Project Phase 2
Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Syracuse, UT 84075

Last Updated 08/03/2022 08:31 AM
Project Title

2022 Secondary Metering Project

Physical Address View project details and contacts
City, State (County) Kaysville, UT 84037   (Davis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor and materials for the removal of the existing secondary connections and installing Owner-supplied boxes, and lids. Approximately 1,600 meters will be installed within a one-year time period. The total number of meters will vary depending on bid prices. Also included in the project is excavation, proper disposal of removed materials, imported backfill material, compaction, miscellaneous fittings to connect to existing piping, all associated appurtenances, and surface restoration. Work shall meet DWCCC pressurized secondary water construction specifications. Est. Completion Date: Oct. 1, 2023

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents