Similar Projects
Designed overlay resurfacing with ADA Improvements on River Oaks Drive, beginning at Price Ave
Infrastructure
Bidding
$2,000,000 est. value
Calumet City, IL

(2.056-Mile) Designed Overlay, ADA Improvements: HMA Removal, Pavement Patching , HMA Resurfacing, Curb Ramps Improvements, Pmk. Fau 133
Infrastructure
Bidding
$2,000,000 est. value
Morton Grove, Niles, Skokie, IL

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

(2.73-Mile) Designed and Standard Overlay Project on Oakton Street, Begins Approx. 150 Feet W. of Busse Highway and Extends E. For 15,023 Feet (2.85 Miles )
Infrastructure
Bidding
IL

Site Paving
Post-Bid
Elgin, IL 60120

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

(1032-Ft) Channelization and Pavement Widening to Add a Right Turn Lane, Traffic Signal Modernization
Infrastructure
Bidding
$2,000,000 est. value
IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

2021 Melinda/Hiawatha Water and Street Improvements
Results
Buffalo Grove, IL 60089

Resurfacing Shields Avenue From Maple Avenue to Custer Avenue
Infrastructure
Bidding
$4,000,000 est. value
Brookfield, IL 60513

2021 Street Improvements
Post-Bid
Lincolnwood, IL

ACM Patch and Repair LBP Goudy ES
Results
Chicago, IL 60640

Reported 04/27/2022 12:00 AM
Project Title

Fiscal 2023 Asphalt Patching Program

Physical Address View project details and contacts
City, State (County) Park Forest, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of: All mobilization, excavation, material, labor, equipment and incidentals necessary for the installation of approximately 1,800 Square Yards of Asphalt Patching over the course of 1 fiscal year (July 2022-June 2023).A contractor will be expected to install patches when the Village of Park Forest has accumulated more that 150 S.Y. in quantity, but limited to 4 callouts/mobilizations per contract period.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents