Similar Projects
Markle Transformer Install
Design
$250,000 to $500,000 est. value
Markle, IN

Spy Run Interceptor Relief - Saint Joe River Crossing
Infrastructure
Bidding
Fort Wayne, IN

Wellhouses 5 and 8 Electrical Upgrades
Alteration
Bidding
Less than $2,000,000 est. value
West Lafayette, IN 47907

Mechanical & Electrical System Services
Post-Bid
Crane, IN 47522

FMS 6 Terre Haute FMS 8 Stout Field OV Energy Conservation
Post-Bid
Less than $150,000 est. value
Evansville, IN 47715

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Spurgeon Lift Station and Force Main
New Construction, Infrastructure
Bidding
Lynnville, IN 47619

Refloat Dock and Electrical Upgrade
Post-Bid
Less than $150,000 est. value
Rockville, IN 47872

2020 Sanitary Sewer Extensions-Contract C
Results
Decatur, IN 46733

LOI- Seeking Qualified Contractors for Various Services
Term Contract
Post-Bid
Marion, IN 46953

Deer Hollow Lift Station Improvements
Results
Fort Wayne, IN 46802

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

South Main Street Water Main Replacement
Results
Monticello, IN 47960

Preventative Maintenance for the Emergency Generators and Transfer Switch Systems
Term Contract
Post-Bid
Less than $150,000 est. value
Plainfield, IN 46168

Reported 11/24/2021 12:00 AM
Project Title

Utility Emergency Repair

Physical Address View project details and contacts
City, State (County) Lebanon, IN   (Boone County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water, sanitary sewer, and electrical repairs, for the period from January 1, 2022, through December 31, 2023: specified pieces of equipment, specified labor groups, and percent mark-up on contractor furnished materials.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents