Similar Projects
Slope Repair and Small Culvert Replacements
Infrastructure
Bidding
$500,000 est. value
NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Avery Road Culvert Repair
Post-Bid
Cold Spring, NY 10516

Emmonsburg Road (CR 130) - Road Slope Armoring
Post-Bid
Salisbury Center, NY 13454

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Culvert Rehabilitation and Replacement - Lower Rd (CR12) over tributary to Wallkill River and Wesley Chapel Rd over Willow Tree Brook
Infrastructure
Bidding
Wesley Hills, NY 10901

White Creek Road (CR 60) - Bank Stabilization
Post-Bid
Newport, NY 13416

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Sheridan Bay Campground Site Improvements
Infrastructure
Bidding
Dunkirk, NY 14048

Lakewood Precision Swale Stormwater Retrofits
Post-Bid
Lakewood, NY 14750

Lasalle Park Shoreline Protection Project
Results
$5,000,000 to $10,000,000 est. value
Buffalo, NY 14207

2021 Subaqueous Water Main Crossing - Shinnecock Canal at Meschutt Beach and Ponquogue Bridge at Lighthouse Road
Infrastructure
Bidding
Hampton Bays, NY 11946

Construction of a Bulkhead 2
Post-Bid
Port Chester, NY 10573

Precast Reinforced Three-Sided Box Culvert and Precast Reinforced Concrete Footings for the Replacement of Orange Spring Bridge
Results
Goshen, NY 10924

Reported 11/19/2021 12:00 AM
Project Title

Break of Day Road Culvert Repair

Physical Address View project details and contacts
City, State (County) Victor, NY 14564   (Ontario County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Consists of installing downstream end of the Break of Day road Culvert, installing cementitious grout underneath the culvert to fill exisiting voids, and spray lining the inside of the culvert with a polymer liner. The project is at the intersection of Break of Day Road and East Victor Road, victor, NY 14564.

Details

Division 09 - Finishes.
Division 31 - Earthwork, Erosion and Sedimentation Controls.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents