Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Emergency Connection - Meter /PRV Facility
Bidding
Waterford, MI

Walnut Lake 1 Force Main Extension Project
Post-Bid
Pontiac, MI

Municipal Parking Lot #5 Outfall Repair
Post-Bid
Birmingham, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Brewster Elementary Parking Lot 2019
Results
Less than $228,790 est. value
Rochester Hills, MI

Grandview Elementary Parking Lot
Bidding
Clarenceville, MI

Newton Road Force Main and Low Pressure Sewer
Post-Bid
Commerce Township, MI

Parking Lot 6 Rehabilitation
Results
Less than $642,864 est. value
Birmingham, MI

Meter Vault at Lyon Township Wastewater Treatment Plant
Bidding
New Hudson, MI

Right of Way Services
Post-Bid
MI

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Meter and Water Tracing Wire
Bidding
Rochester Hills, MI

Holly Recreation Area, Wastewater System Improvements
Post-Bid
Holly, MI 48442

TRI-A Subdivision Watermain Replacement
Results
Less than $865,958 est. value
Walled Lake, MI

Last Updated 11/13/2019 08:32 AM
Project Title

Washington Road Water Main and Sidewalk Project and Flood Protection

Physical Address View project details and contacts
City, State (County) Rochester, MI 48306   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Washington Road Water Main and Sidewalk Project: This Project consists of removal and placement of water main and concrete sidewalk along the south side of Washington Road, including all necessary labor, equipment, and materials required for the proposed work. The Scope also includes complete restoration of all areas related to the construction. Maple Creek Village Flood Protection Project: This Project consists of improving drainage for Maple Creek Village Subdivision by installing new storm sewer under Washington Road, including all necessary labor, equipment, and materials required for the proposed work. The Scope also includes complete restoration of all areas related to the construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents