Similar Projects
Reported | 07/10/2021 12:00 AM |
Project Title | Turtle Creek, Mary`s Creek, the Bay Area and the Feeder Channel System Maintenance Dredging |
Physical Address | View project details and contacts |
City, State (County) | Sunset Beach, NC (Brunswick County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of mechanical dredging of the referenced residential navigation systems with truck haul and upland placement of dredge material. Approximately 42700 CY will be mechanically dredged, and truck hauled to an upland placement site. The design depth ranges from 3 ft MLW to 5 ft MLW with a 1 ft over dredge tolerance. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |