Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing
Infrastructure
Conception
$4,014,000 CJ est. value
Olivet, SD 57052

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Modify Intersection, PCC Surfacing
Infrastructure
Design
$3,600,000 CJ est. value
Harrold, SD 57536

Grading, Rubbilize PCC, Asphalt Concrete Surfacing
Infrastructure
Bidding
$8,260,000 CJ est. value
Brookings, SD 57006

Replace Str Bridge, Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$9,261,000 CJ est. value
Philip, SD 57567

Airport Improvements
New Construction
Post-Bid
Hot Springs, SD 57747

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

D & I Railroad Mainline and Crossing Improvements
New Construction, Alteration
Results
Brookings, SD

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

Pinnacle Estates Addition
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Tea, SD 57064

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Mill and AC Resurfacing, Pipe Work
Infrastructure
Conception
$12,284,000 CJ est. value
Faulkton, SD 57438

Last Updated 09/26/2022 11:11 PM
Project Title

New City Hall - Watertown City Hall

Physical Address View project details and contacts
City, State (County) Watertown, SD 57201   (Codington County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 26, 2022, the project was not awarded but will rebid in the future date. https://www.thepublicopinion.com/story/news/2022/08/16/council-renegotiate-city-hall-remodel-bid-only-bidder/10328657002/ The only bid received for the city hall renovation and addition project was unanimously rejected by the Watertown City Council during Monday's meeting. The estimated cost for the base bid and all four alternate options was $3.5 million. But the bid from Gray Construction Co. was for $5.8 million. Watertown has been moving toward revamping the old Wells Fargo building to be the new city hall. But high costs have hindered the process, though the city is still looking at options. The estimated overall cost of the project was $6.3 million. But the bid pushes the cost to about $2.4 million beyond that total. There are also other costs not included in the bid, including buying the building for $1.3 million. The project budget includes a 2.5% contingency, the site purchase, audio and video equipment, architectural and engineering fees, asbestos surveys and furniture, fixtures and equipment. Alternate bids $600,000 above estimate The four alternates include an enclosure to the existing drive-thru canopy, a council chambers addition, wainscot paneling and the replacement of the tree grates. The total estimated cost of the alternates was $1.5 million, but the bid amount is $2.1 million. The bid for asbestos abatement came from Horsley Specialties Inc. for $64,935, which is higher than the estimate of $50,000. "I know a lot has gone into this multi-year project," said Councilman Colin Paulsen. "Unfortunately, we are at a point where we are all in agreement that the most appropriate action is to reject these bids for being so far over our budget." City staff has been working with Gray Construction to reduce the bid by $1.4 million. Even if that works, the city will still need a $1 million supplement to increase the total budget for the city hall renovation project from $6.3 million to $7.3 million. "The bid came in higher than expected," said Assistant City Engineer Justin Petersen. "Staff had several conversations with the architect, and ultimately, the motion is to reject all bids and negotiate with the low bidder and the contract price." Funding for the project is provided through the capital improvement fund for $5.25 million. That includes the savings from the 10th Avenue North project bond of $250,000. The $1.05 million needed to reach the $6.3 million for the project would come from the unrestricted reserve balance. And the extra $1 million would be allocated in fiscal year 2023. _________________________________________________________________________________________________________________________________________________ The Project includes the following Work: Renovation of existing former Wells Fargo Bank building and adjacent drive thru, alternates for meeting room addition and enclosure under existing drive thru canopy Owner anticipates that the Projects total bid price will be approximately $1.7m. The Project has an expected substantial completion date of July 1, 2023. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Architect/Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than those designated above. The project is subject to LIQUIDATED DAMAGES as further outlined in the Project Manual. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The project consists of a renovation to an existing one-story building with a basement. The building was formerly used as offices and support for a bank branch. The new occupants shall use the facility as offices with the addition of a large meeting space. There is a proposed alternate for an addition to the facility for a large meeting room.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents