Similar Projects
FY2022 Freezer Road Pump Station Upgrades - General Bid
Renovation
Bidding
$1,499,000 est. value
Barnstable, MA 02630

Park Street Pump Station Replacement Project
Renovation
Bidding
$500,000 est. value
Stockbridge, MA 01262

Mizaras Well Pump Station
New Construction
Sub-Bidding
$2,700,000 est. value
Middleborough, MA

School Street Pump Station Odor Control - Sub Bid
Renovation
Sub-Bidding
$980,000 est. value
Agawam, MA 01001

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Sewage Lift Station Replacement
Results
Less than $250,000 est. value
Boston, MA

Permanent COMM Connection Project
Results
$334,000 est. value
Hyannis, MA 02601

Mizaras Well Pump Station
New Construction
Bidding
$2,700,000 est. value
Middleborough, MA

Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 2 - Filed Sub Bid
New Construction
Sub-Bidding
$7,000,000 est. value
Burlington, MA 01803

2020 Pump Station Improvements Project - General Bids
Post-Bid
$1,250,000 est. value
Weymouth, MA

Rose Park Pump Station Upgrades - General Bids
Results
$637,688 est. value
Pittsfield, MA 01201

School Street Pump Station Odor Control - General Bid
Renovation
Bidding
$980,000 est. value
Agawam, MA 01001

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - Sub Bid
Renovation
Sub-Bidding
$5,000,000 est. value
Acton, MA

Main Lift Station Bypass
Post-Bid
Vineyard Haven, MA

Last Updated 02/23/2022 02:10 PM
Project Title

Front Street Pump Station Resiliency Improvements

Physical Address View project details and contacts
City, State (County) Marion, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction improvements to provide a bypass system to allow bypass of the Front Street Pump Station / force main and replacement of the off site air release valve on the force main, along with the potential installation of a tapping sleeve and valve on the force main.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents