Similar Projects
Street Resurfacing Project 2022
Infrastructure
Bidding
$600,000 est. value
Dothan, AL

Constructing the Resurfacing on Hodgesville Road From the Junction of East Saunders Road
Post-Bid
$513,012 to $627,244 est. value
AL

2021 Resurfacing Project
Post-Bid
Bay Minette, Daphne, Robertsdale, Spanish Fort, AL 36527

Farmer`s Market Roadway Paving Project
Results
$50,000 to $75,000 est. value
Foley, AL

Mickey Miller Blackwell Stadium Track Runway Resurfacing
Results
Gulf Shores, AL

2021 Resurfacing Project Group B
Post-Bid
Elberta, Loxley, Robertsdale, AL 36551

Resurfacing Projects 2021 Group 3
Results
AL

Addition of Bike/Pedestrian Facility to Houston Street
Infrastructure
Post-Bid
$150,000 to $175,000 est. value
Cottonwood, AL 36320

Walton Park Trail Paving
Results
Less than $201,670 est. value
Dothan, AL

Asphalt Repair Eastbay Apartments
Infrastructure
Post-Bid
Daphne, AL

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-3 (US-31) from the junction of Church Street
Results
$3,015,579 to $3,685,708 est. value
Bay Minette, AL 36578

Asphalt Resurfacing Project 2021
Infrastructure
Post-Bid
Loxley, AL

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-16 (US-90)
Results
$2,763,523 to $3,377,639 est. value
Spanish Fort, AL

Bituminous Surface Treatments
Infrastructure
Post-Bid
Dothan, AL

Medical Village Access Improvements Phase 1B
Results
$1,400,000 to $2,100,000 est. value
Gulf Shores, AL

Last Updated 06/12/2022 11:52 PM
Project Title

Baldwin County Resurfacing Projects 2022: Group #2

Physical Address View project details and contacts
City, State (County) Dothan, Fairhope, Foley, Robertsdale, Summerdale, AL 36574 (Baldwin, Houston Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Baldwin County Resurfacing Projects 2022: Group # 2/bcr-2022-2 Hw22077 - Heartland Circle From County Rd 54 Loop Back to County Rd 54 Hw22076 - County Rd 26 From County Rd 95 to John Bloch Rd Hw22086 - Carver Ln From County Rd 71 S to Eom Additive 1 Hw22079 - Stucki Rd From County Rd 20 to Feely Rd Hw22006 - Feely Rd From County Rd87 to Breman Rd Hw22005 - Breman Rd From Feely Rd to Us Hwy 98 Additive 2 Hw22078 - Old Brady Rd From County Rd 68 Ext to Eop Hw22001 - County Rd 68 From Roserun Rd to County Rd 68 Ext Hw22002 - County Rd 68 Ext From County Rd 68 to Styx River Bridge Additive 3 Hw22142 - Nw 1st St From E Broadway Ave to W Shriver Ave Hw22095 - E Broadway Ave From Sw 1st St to County Rd 73 Hw22110 - Sw 1st St From State Hwy 59 to Briadway Ave Hw22105 - Raley Rd From County Rd 71 S to Daugherty Rd Hw22093 - County Rd 71 S From State Hwy 59 to Carver Ln Hw22114 - W Broadway Ave From Sw 1st St to State Hwy 59 the Estimated Total Tonnage of Bituminous Plant Mix for: Group 2 Is Approximately 1,851 Tons, Additive 1 Is Approximately 5,142 Tons, Additive 2 Is Approximately 4,115 Tons and Additive 3 Is Approximately 6,077 Tons. Details Concerning These Roads and a Map of Their Locations Are Included Within the Contract Documents. The Construction Start Date Will Be on or About July 1, 2022. If the Contractor Wishes to Begin Work Early, Approval From Baldwin County Must Be Obtained First. Five (5) Working Days Are Allowed for the Construction of Group 2/ Bcr-2022-2. (Base Project). Ten (10) Working Days Are Allowed for the Construction of Additive 1 as Awarded. Ten (10) Working Days Are Allowed for the Construction of Additive 2 as Awarded. Ten (10) Working Days Are Allowed for the Construction of Additive 3 as Awarded. Baldwin County Resurfacing Projects 2022: Group # 2ra/bcr-2022-2ra Hw22004 - County Rd 54 From County Rd 55 State Hwy 59 Hw22003 - County 64 Ext From Waterworld Rd to County Rd 112 Hw22007 - County Rd 95 From Us Hwy 98 South to Eom the Estimated Total Tonnage of Bituminous Plant Mix for Group 2ra Is Approximately 23,322 Tons.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents