Similar Projects
Furnish and Install Air Handler Units at Frank E. Van Lare Wastewater Treatment Facility
Renovation
Sub-Bidding
$400,000 CJ est. value
Rochester, NY 14617

Bausch and Lomb Library Mechanical Equipment Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Rochester, NY 14604

Heat Pumps
Alteration
Post-Bid
Rochester, NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Services
Term Contract
Results

Furnish Outdoor Rooftop Air Handling Unit
Results
Rochester, NY 14614

Water Treatment Program for College HVAC Systems
Renovation
Sub-Bidding
$300,000 CJ est. value
Rochester, NY 14604

HVAC
Alteration
Post-Bid

Remove Existing, Furnish and Install New Air Handler at Monroe County Jail Mezzanine Level
Results
Rochester, NY 14614

New York State Office of Mental Health, Rochester Psychiatric Center, Building 16 Renovations including Hazardous Materials Abatement - HVAC
Renovation
Sub-Bidding
$987,000 CJ est. value
Rochester, NY 14620

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

AERCO Boiler Replacement
Results
Rochester, NY 14608

Town of Brighton Barn Addition - HVAC
Addition, Demolition, Infrastructure - 3,742 SF
Sub-Bidding
$500,000 CJ est. value
Rochester, NY 14618

ROC ATCT Base Building HVAC Upgrade
Alteration
Post-Bid
$250,000 est. value
Rochester, NY 14624

Replace Steam Boiler and Feedwater Set - HVAC Commercial
Alteration
Results
Rochester, NY 14608

Last Updated 09/28/2022 01:10 AM
Project Title

Monroe County Cityplace Space Utilization Renovation Contract No - 3 - Mechanical (HVAC) Construction

Physical Address View project details and contacts
City, State (County) Rochester, NY 14614   (Monroe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical (HVAC) Construction: Renovations to the 1 st , 3 rd , 7 th and 8 floors of the CityPlace Building including replacement of the existing heat pumps that are currently serving the 3 rd , 7 th and 8 th floors. The heat pump supply and return ductwork, piping connections, and supply and return grilles will be modified as required to accommodate renovations. Also included is the replacement of the outside air units that provide ventilation air to the 7 th and 8 th floors.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents