Similar Projects
Drain Tile and Basement Slab
Alteration
Results
Minneapolis, MN 55411

Concrete Rehabilitation, Bituminous Milling
Alteration
Results
MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Silver Ramp Corrective Work
Alteration
Results
$3,291,435 est. value
Minneapolis, MN

Excelsior Commons Concessions Building
New Construction, Infrastructure, Alteration
Post-Bid
Minnetonka, MN

RAC Site Prep
Infrastructure
Post-Bid
$425,000 CJ est. value
Hassan Township, MN 55374

Repair Interior Multiple Buildings
Renovation
Post-Bid
$500,000 CJ est. value
Saint Paul, MN 55111

Folwell and 46th Ave. S. ADA Pedestrian Ramp Program - ReBid
Infrastructure
Post-Bid
$1,637,022 CJ est. value
Minneapolis, MN 55406

Normandale Hills Elementary School Mechanical Improvements
Renovation
Post-Bid
$10,750,000 CJ est. value
Minneapolis, MN 55437

Nutrition Center Office Renovation
Renovation
Post-Bid
$400,000 CJ est. value
Minneapolis, MN 55411

Bridge No. 27J78 Replacement on Trailhaven Road
Demolition, New Construction, Infrastructure
Results
$194,601 CJ est. value
Corcoran, MN 55340

PW-Ready Mix Concrete
Term Contract
Post-Bid
Minneapolis, MN 55415

Maple Grove Middle School Park Trail Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Maple Grove, MN 55369

Water Treatment Plant No. 15 2023 Improvements Project
Infrastructure, Renovation
Results
$218,929 CJ est. value
Minnetonka, MN 55345

Last Updated 02/20/2023 10:07 AM
Project Title

Minnehaha Creek Preserve Boardwalk Reconstruction

Physical Address View project details and contacts
City, State (County) St Louis Park, MN 55426   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,858,182 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 17, 2023, the project has been awarded. A timeline for construction has not been confirmed at this time. Site Directions: 7341 Oxford Street, St. Louis Park, MN 55426 The trails can be accessed from three main trailheads, on the west, north and south sides. If you are driving, the easiest access point is at Creekside Park, 7341 Oxford Street, St. Louis Park, or from the south off Excelsior Boulevard. There is pedestrian access from the west where Powell Road crosses the creek on both the north and south sides, and from the east on Louisiana Avenue, just south of the creek. All communications relative to this project should be addressed to the ENGINEER Attn: Casey Black, cblack@srfconsulting.com, or 763-452-4751 prior to opening of the Bid. Bid Proposals shall be submitted on forms furnished for that purpose. Each bid proposal shall be accompanied by a "Bid Security" in the form of a certified or cashier's check made payable to Minnehaha Creek Watershed District ("OWNER") in an amount not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the OWNER, with a surety company duly authorized to do business in the state of Minnesota, such Bid Security to be a guarantee that the bidder, if awarded a contract, will enter into a contract with Minnehaha Creek Watershed District; and the amount of the certified check will be retained or the bond enforced by the OWNER in case the bidder fails to do so. The OWNER will retain the deposits for the three lowest bidders until the contract has been awarded and executed but not longer than sixty (60) days after bid opening. No bid may be withdrawn for a period of sixty (60) days following the bid opening. The bid of the lowest responsible bidder is intended to be accepted on or before the expiration of sixty (60) days after the date of the opening of bids. The OWNER, however, reserves the right to reject any or all bids and to wave any minor irregularities, informalities or discrepancies, and further reserves the right to award the contract in the best interest of Minnehaha Creek Watershed District. The work, in accordance with drawings and specifications prepared by SRF Consulting Group, Inc. consists of the following major items of work: Timber boardwalk removals Timber boardwalk construction Bituminous milling and paving Excavation Riprap *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents