Similar Projects
Heritage Harbour - Parcel 25
New Construction - 73,468 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bradenton, FL 34202

Manatee Motorwerks
New Construction - 3,808 SF
Design
Bradenton, FL 34209

University Town Center Parcels 26 and 27
New Construction - 16,443 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sarasota, FL 34243

Starbucks - Interior
Build-Out
Bidding by Invitation
Lakewood Ranch, FL

Gettel KIA of Bradenton
Renovation, Addition - 25,965 SF
Bidding by Invitation
Bradenton, FL 34207

Take 5 Oil Change
New Construction - 1,421 SF
Post-Bid
$500,000 est. value
Bradenton, FL 34203

Bonefish #7008
Renovation
Post-Bid
Sarasota, FL 34201

Carmax #6103
New Construction - 8,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Bradenton, FL

Wendy's #11897
New Construction - 2,426 SF
Construction
$500,000 est. value
Bradenton, FL 34203

Chipotle
New Construction - 2,448 SF
Pending Verification
Ellenton, FL 34222

Christian Brothers Automotive
New Construction
Pending Verification
Bradenton, FL

Take Five
New Construction - 1,421 SF
Design
$500,000 est. value
Bradenton, FL 34203

Jeremiah's Italian Ice
Renovation - 1,016 SF
Post-Bid
$150,000 est. value
Bradenton, FL 34205

Starbucks
New Construction - 2,500 SF
Construction
$500,000 to $1,000,000 CJ est. value
Ellenton, FL 34222

Rye Road - Masterplan
New Construction - 300,000 SF
Design
$10,000,000 CJ est. value
Parrish, FL 34219

Last Updated 09/21/2020 11:29 AM
Project Title

Off Lease Only

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34205   (Manatee County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Vehicle Sales/Service
Contracting Method
Project Status Construction Commenced September 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and Site Work are complete, vertical construction is temporarily on hold

Details

,, 46,220 SF - Food/Beverage Service, 1 Story Above Grade, 2,438 SF New Construction, Vehicle Sales/Service, 2 Stories Above Grade, 43,782 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Office Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Elevators, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents