Similar Projects
Single-Ply Re-Roof Job for Two Sections of the Kanab High School
Bidding
Kanab, UT 84741

Uu Hper Plaza Reroof
Bidding
$1,100,000 est. value
Salt Lake City, UT 84112

First Step Housing Roofing Project
Renovation
Post-Bid
Salt Lake City, UT

Millcreek Residential Roof Replacement
Post-Bid
Millcreek, UT

Corinne and Jack Sweet Library Roof Replacement
Results
Salt Lake City, UT 84103

Public Library System - Day-Riverside Branch Roof Replacement Project
Results
Salt Lake City, UT 84116

Public Utilities Building Replacement of North Membrane Roof
Bidding
Sandy, UT 84070

Oak City Roof Replacement
Renovation - 38,500 SF
Post-Bid
Oak City, UT

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Box Elder Middle School Partial Re-Roof
Post-Bid
Perry, UT 84302

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Salt Lake Airport On-Call Roofing Contractor Services
Term Contract
Post-Bid
West Jordan, UT 84084

Sorenson P.E Building Barrel Roof Replacement Southern Utah University
Results
$200,000 est. value
Cedar City, UT 84720

Re-Roof
Post-Bid
Kanab, UT 84741

ELC Building Roof Replacement Southern Utah University
Results
$270,000 est. value
Cedar City, UT 84720

Last Updated 05/07/2021 10:44 AM
Project Title

Ogden Court Roof Replacement

Physical Address View project details and contacts
City, State (County) Ogden, UT 84401   (Weber County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of demolition and removal of the existing ballasted asphalt roofing system, cap and counter flashings, roof hatches, guard railing and some electrical items. The new work will consist of a new TPO roofing system with area of tapered insulation, raised parapets, new mechanical curbs, new roof primary & secondary drains, guard railings, some locations will receive new E.I.F.S. and areas of the roof will receive new electrical items as indicated on the construction documents. Existing mechanical units will be required to be disconnected, raised and reset with new mechanical curbs and duct extensions to be provided.

Details

Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents