Similar Projects
Tom Corley Place/Townhome Subdivision
New Construction, Infrastructure
Conception
$12,825,000 CJ est. value
Lexington, SC 29072

US 378 Over Twelve Mile Creek
Demolition, New Construction, Infrastructure
Conception
$11,785,000 CJ est. value
Lexington, SC 29072

Batesburg-Leesville Boarding Facility
New Construction, Infrastructure - 4,000 SF
Design
$600,000 CJ est. value
Leesville, SC 29070

Lexington County Boardwalk
Infrastructure
Design
Leesville, SC 29070

FM-MNS Road Maintenance
Infrastructure
Bidding
$250,000 CJ est. value
Columbia, SC 29212

Irmo High School East Wing Replacement - District 5 of Lexington and Richland Counties
New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Columbia, SC 29212

RFP Construction Manager At-Risk - Lake Murray Water Treatment Facility Expansion
Renovation
Post-Bid
$55,000,000 CJ est. value
Columbia, SC 29212

Pump Station Upgrades Saxe Gotha Industrial Park
Renovation
Results
West Columbia, SC 29171

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Murphy Express #8643 / Springdale
Demolition, New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Cayce, SC 29033

Chick-fil-A Supply Distribution Center - Saxe Gotha Industrial Park / West Columbia
New Construction, Infrastructure - 245,000 SF
Construction
$80,000,000 CJ est. value
West Columbia, SC 29172

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Cardiac Catheterization Lab - Lexington Medical Center
Addition, Demolition, Infrastructure
Pending Verification
$2,902,219 CJ est. value
West Columbia, SC 29169

US 21 over Congaree Creek
Demolition, New Construction, Infrastructure
Conception
$6,750,000 CJ est. value
Cayce, SC 29033

803 Industrial Park / Gateway Building Two
New Construction, Infrastructure - 408,240 SF
Design
$220,000,000 CJ est. value
West Columbia, SC 29170

Last Updated 06/20/2023 01:38 PM
Project Title

B-L WWTP Liquid Chemical Feed Project

Physical Address View project details and contacts
City, State (County) Batesburg, SC 29006   (Lexington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,149,455 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes: The construction of a masonry block building, concrete slab, installation of bulk chemical storage tanks, recirculation pumps and chemical feed pumps for the chlorination and de-chlorination process at the Towns wastewater facility. The Information for Bidders, Bid Form, Contract, Plans, Specifications, Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the following locations: Owner: Town of Batesburg-Leesville, South Carolina Engineers: Summit Engineering Group, Inc., Spartanburg, SC. Only those contract drawings, specifications and bid documents obtained from the Engineer are official. Bidders cannot rely on the accuracy of copies of the aforementioned documents, drawings, specifications, etc. obtained from any other source. Bidders must be on the Engineers official plan holders list for bids to be accepted by the Owner. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. This project is being funded in whole or in part by the Community Development Block Grant Program (CDBG). All federal CDBG requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders on this work will be required to comply with the Presidents Executive Order No. 11246 & Order No. 11375 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI if the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240. The CDBG application, including the cost estimate, is available for review by contacting (Mr. Tim Schumpert, P.E., Utilities Director, Town of Batesburg-Leesville. Bidders must comply with Title VI if the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and 40 CFR 33.240. The CDBG application, including the cost estimate, is available for review by contacting (Mr. Tim Schumpert, P.E., Utilities Director, Town of Batesburg-Leesville at tschumpert@batesburg- leesville.org . Bidders must also make positive efforts to use small and minority-owned business and to offer employment, training and contracting opportunities in accordance with Section 3 of the Housing and Urban Development Act of 1968. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law (South Carolina Code of Laws as amended Chapter 11, Sections 40-11-5 through 40-11-570). Contractors shall have a classification of WP. No bidder may withdraw the bid within one hundred twenty days after the actual date of the opening and reading thereof. The Owner reserves the right to waive any informalities or to reject any or all bids. Completion Date: 270 Calendar Days Liquidated Damage: $1500 per Calendar Days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents