Similar Projects
General Services Contract
Term Contract, Alteration
Bidding
Blackstone, VA 23824

Acorn Road Drainage
Infrastructure
Bidding
$10,000 to $50,000 est. value
Appalachia, Bristol, Norton, VA 24216

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Galvanized Polymer Coated Corrugated Metal Pipe
Results
Christiansburg, VA

Elliptical Pipe
Term Contract
Results
Broadway, Edinburg, Elkton, Fishersville, Greenville, Harrisonburg, Luray, Mount Crawford, Mount Solon, New Market, Stanley, Staunton, Swoope, Toms Brook, Verona, VA 24440

High Knob Recreation Area Improvements Project
Post-Bid
Norton, VA

EW-6 Headwalls
Results

Construction of Educational Pond Rehabilitation at Virginia Aquarium
Infrastructure
Post-Bid
$390,300 est. value
Virginia Beach, VA

Stock Class 3 Reinforced Concrete Pipe
Results
Newport News, VA

Construction of North Holly IIIB Watershed Improvements
Infrastructure
Post-Bid
Virginia Beach, VA

Bayberry Subdivision Drainage Improvements - Phase 1
Results
Newport News, VA

Precast Box Culvert Wise Residency
Infrastructure
Post-Bid
Bristol, Norton, VA

Country Club Road Drainage Improvements - Phase III
Results
Newport News, VA

Scale Pit Wall and Headwall Repairs
Infrastructure
Post-Bid
Petersburg, VA

Last Updated 05/25/2022 01:03 AM
Project Title

Cut Slope Stabilization US 250 Westbound

Physical Address View project details and contacts
City, State (County) VA   (Nelson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of scaling rock slopes by manual methods requiring highangle industrial rope access methods as specified on approximately 4300 square feet of surface located above US-250 Westbound (Rockfish Gap Turnpike) Site 3, location in Nelson County

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents