Similar Projects
Blakely Gateway
Infrastructure
Post-Bid
$500,000 CJ est. value
Blakely, GA 39823

Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30334

Sidewalk Project on Mcfarland and Shiloh Road
Results
GA

Mott's Green Plaza P. I. #0015287
Results
Columbus, GA 31902

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

SPLOST VII Sidewalk Project
Results
Albany, GA

City of Jesup Streetscape Phase II
Infrastructure
Post-Bid
Jesup, GA 31546

Streetscapes III Sidewalk Phase
Results
Woodstock, GA

Floor Covering, Painting and Parking Lot
Infrastructure, Alteration
Post-Bid
GA

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Riverwalk Extension
Infrastructure
Post-Bid
Savannah, GA

Gunnin Road Sidewalks
Results
$723,388 est. value
Peachtree Corners, GA 30092

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

Savannah Rapids Pavilion Parking Lot Expansion - R
Results
$836,954 est. value
GA

Last Updated 11/09/2022 05:41 AM
Project Title

Burke County Recreation Department Baseball Field Parking Lot Paving - Bid 2 (Seal and Stripe Existing Adjacent Parking Lot)

Physical Address View project details and contacts
City, State (County) Waynesboro, GA 30830   (Burke County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid 2 (Seal and Stripe Existing Adjacent Parking Lot): Fill all cracks in existing pavement Cut and patch lower corner of pavement to tie-in new parking lot Seal coat entire existing parking lot Re-stripe parking as per layout provided (alternate layout to be submitted for approval Job to be completed no later than Sept 22, 2022

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents