Similar Projects
Payson 6,8,10 Mechanical Rooms Upgrades
Post-Bid
Payson, UT

Alpine School District - HVAC Air Filters and Delivery
Term Contract
Post-Bid
Lindon, UT 84042

Spring Creek Elementary Chiller Replacement
Results
Provo, UT

S--PAO & PGMB Facility Maintenance
Results
Pleasant Grove, UT

Payson 6, 8, 10
Construction
$498,800 est. value
Payson, UT 84651

Grove Park 5, 6 Vineyard 1 & 2 - HVAC
Renovation
Construction
$450,000 est. value
Orem, UT 84057

Alpine School District Large Commercial HVAC System Installation, Maintenance, and Repair Services
Results
Alpine, UT

Alpine School District Small Commercial HVAC System Installation, Maintenance, and Repair Services
Term Contract
Results
Alpine, UT

DFCM Construction-Pre-Qualified Mechanical Contractors-Aspen Complex Controls Upgrade
Results
Less than $180,000 est. value
American Fork, UT

Public Safety Condensing Units and Boilers
Results
Less than $110,000 est. value
Orem, UT

DFCM Construction-Pre-Qualified Mechanical Contractors-Provo Regional Chiller Upgrades
Results
Less than $758,000 est. value
Provo, UT 84606

Highland Elementary School Chiller Replacement
Results
Highland, UT 84003

DFCM Construction - Pre-Qualified Mechanical - UVU LA and CS AHU Upgrades
Results
Less than $1,185,000 est. value
Orem, UT 84058

DFCM Construction-Pre-Qual Mechanical-Uvu Campus Domestic Water Loop Upgrade
Results
$333,000 est. value
Orem, UT

DFCM Construction - Payson Va Kitchen, Laundry and HVAC Upgrades - Department of Veterans Affairs
Results
Less than $167,000 est. value
Payson, UT 84651

Last Updated 09/19/2019 02:18 PM
Project Title

Eagle Crest and Foothill Elementary Schools ATC Upgrade

Physical Address View project details and contacts
City, State (County) Lehi, UT 84043   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Upgrading the automatic temperature control (ATC) system or building automation control system existing in the school by replacing the existing. 2. Provision and installation of the upgraded automatic temperature control system as indicated on drawings and within the specifications. Please note that there are separate drawings and specifications for each of the projects. Foothill Elementary School 921 North 1240 East, Orem, Utah Eaglecrest Elementary School 2760 North 300 West, Lehi, Utah
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents