Similar Projects
Sealcoating-22
Infrastructure
Bidding
$60,000 est. value
Johnsburg, IL 60051

Designed Overlay Resurfacing on County-Line Rd Beginning at E. of Haegers Bend Rd
Infrastructure
Bidding
Barrington Hills, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 HMA Materials Only
Post-Bid
McHenry, IL

(2.578-Mile) Improvement on Il-120 (Belvidere Road) From Mchenry Co. Line to East of II-60 Consist of Sealing Cracks and Joints in the Existing Concrete Pavement, Restriping Pavement Marking
Results

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

2022 Pavement Condition Assessment
Infrastructure
Bidding
IL

2021 Asphalt Purchase
Post-Bid
IL

2021 Road Resurfacing Program
Results
Cary, IL

McHenry County Partnering Initiative 2022 Patching Program Joint
Infrastructure
Bidding
$67,000 est. value
Crystal Lake, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Wonder Woods Subdivision And Wonder Woods Drive Road Improvements
Results
McHenry, IL

HMA Pavement Resurfacing
Infrastructure
Bidding
$200,000 est. value
Prairie Grove, IL 60012

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

Last Updated 04/19/2022 09:50 AM
Project Title

2022 Road Program

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall include, but not be limited to, the following: 1. HMA Surface Removal, HMA Level Binder Course, Tack Coat, and HMA Surface Course. 2. Pavement markings. 3. All ADA ramps and curb repairs have been performed in advance of the project by City staff and/or other vendors. 4. Structure adjustments shall be limited to placement of steel adjusting rings for existing frame and lids within the pavement area. 5. An aggregate wedge shoulder or topsoil, seed, straw mulch shall be provided in areas without curb as directed by the engineer where needed. 6. All traffic control and protection. 7. Coordination and notification with residents concerning individual resident access. 8. Landscape restoration with pulverized topsoil, straw mulch, seeding and fertilizers. 9. Protection of existing service lines and utilities. 10. Any 662 or 663 testing for CCDD dump site removal requirements. 11. Site cleanup.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents