Similar Projects
RV Parking Expansion
Addition
Design
West Chester, PA 19382

LED Traffic Signals
Bidding

Intersection Improvements at South New Street and West Nields Street
Bidding
$220,000 to $270,000 est. value
West Chester, PA 19382

Misc. Traffic Control Devices
Term Contract
Post-Bid

Advanced Traffic Management System
Term Contract
Results
$4,872,319 est. value

Traffic Signal Services
Term Contract
Results
Phoenixville, PA 19460

Eagle Village Parking Expansion
Addition
Construction
$100,000 est. value
Chester Springs, PA 19425

Paoli Pk Trail-Seg C
Results
$1,000,000 to $2,499,999 est. value
PA

Traffic Signal Improvements - West Chester Pike (SR 3) and North Chester Road (SR 352)
Results
West Chester, PA 19382

Woodbine Road Multi-Use Trail Design/Build Limited to ADA Ramps
Results
$500,000 to $999,999 est. value
PA

ADA Improvements - Bob White and Swedeland Parks
Results
King of Prussia, Wayne, PA 19087

Egypt Road Adaptive Signal Control Installation
Results
Less than $269,000 est. value
Phoenixville, PA 19460

PA 82 Crosswalks
Results
$500,000 to $999,999 est. value
PA

Schuylkill River Trail
Results
$7,500,000 to $9,999,999 est. value
PA

Fricks Locks Village Trailhead
Results
$475,000 to $515,000 est. value
Pottstown, PA 19465

Last Updated 01/22/2020 09:04 AM
Project Title

Route 100 Multi-Modal Trail Exton Train Station to Chester Valley Trail and Signal Upgrades and Crossing Improvements

Physical Address View project details and contacts
City, State (County) Exton, PA 19341   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the combination of two projects: 1. The Rt. 100 Multi-Modal Trail – Exton Train Station to Chester Valley Trail which is for the construction of a multi-use path from the Exton Train Station parking lot to the Chester Valley Trail at Commerce Drive, and 2. Signal Upgrades and Crossing Improvements to the Chester Valley Trail which is for the construction of the fourth and final crosswalk across Rt. 100 (Pottstown Pike) to allow trail users to cross the intersection via one crosswalk rather than three crosswalks. This portion is included as a Bid- Alt. The Signal Upgrades project is contiguous with and overlaps the northern portion of the Rt. 100 Multi-modal Trail project. Major components of work include: 1. Construction of concrete multi-use trail with ADA compliant curb ramps 2. Construction of asphalt multi-use trail with ADA compliant curb ramps 3. Traffic signal modifications 4. Modification/reconstruction of islands 5. Drainage modifications 6. Re-establishing landscaping 7. Re-establishing irrigation system 8. Design and installation of lighting 9. Site restoration 10. Temporary traffic control

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents