Similar Projects
Streetscape And Road Improvements - West Avenue, Quincy, Orchard And Butler Streets - City of Norwalk
Infrastructure
Conception
$1,100,000 est. value
Norwalk, CT

East Avenue Roadway And Bridge Reconstruction - City of Norwalk
Renovation, Infrastructure
Conception
$4,273,000 est. value
Norwalk, CT 06854

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Langankes Landing
New Construction, Infrastructure - 4,200 SF
Design
$3,000,000 CJ est. value
Shelton, CT 06484

Sanitary Sewer Contract 75
Infrastructure
Bidding
$200,000 CJ est. value
Westport, CT 06880

Sanitary Sewer Contract 73
Infrastructure
Bidding
$200,000 CJ est. value
Westport, CT 06880

The Crossing at the Fairfield Metro Center - Phase 1
New Construction, Infrastructure - 17,625 SF
Sub-Bidding
$14,000,000 CJ est. value
Fairfield, CT 06824

The Crossing at the Fairfield Metro Center - Phase 1
New Construction, Infrastructure - 17,625 SF
Sub-Bidding
$14,000,000 CJ est. value
Fairfield, CT 06824

Greenwich High School Phase II Remedial Action
Results
Greenwich, CT 06830

Site Work Services
Infrastructure
Results
Stamford, CT

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

Seaview Corridor Improvements - City of Norwalk
Infrastructure
Conception
$250,000 est. value
Norwalk, CT

Oldfield Road Apartments
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Fairfield, CT 06824

Danbury Career Academy - City of Danbury
New Construction, Infrastructure
Bidding
$164,000,000 CJ est. value
Danbury, CT 06810

Reported 12/15/2022 12:00 AM
Project Title

Darien Railroad Station Improvements

Physical Address View project details and contacts
City, State (County) Darien, CT 06820   (Fairfield County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Paving/Reconstruction, Railroad/Subway, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction Start Expected October 2022,
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As per the Owner the solicitation has been cancelled and will rebid at a later date in 2023. Editorial Content Team is actively seeking updated information State Project Number(s) & Description: State Project No. 301-195; Darien Railroad Station Improvements Required Prequalification Work Classification(s): 25B Vertical Construction - Intermediate Federal-aid Project Number(s) & Funding Source: FTA (F.A.P. No. CT-0221-013) and State Pre-Bid Conference and/or Site Visit Information: July 14, 2022 District Number(s): 5 - New Haven Contract DBE % Goal or SBE % Set-Aside: 10% DBE Project Scope Code: K - $ 20,000,000 - $ 29,999,999 Completion Date : 950 Calendar Days Liquidated Damages Rate: 8900.00 Days DBE Submittal Requirements - The two (2) lowest bidder's DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all "backup" documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidder's SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. Prequalification Requirements: Prospective bidders must be prequalified with the Department of Transportation and have on file a sworn Statement (CON 16) by the time of the bid. In order to help ensure that prospective bidders may become prequalified in time for the bid opening for a given contract, contractors should be certain to return the Prequalification Application (CON 16) with all necessary information, signatures and notarized documents, to the DOT Contracts Unit at least thirty (30) calendar days before requesting a bid proposal form for that contract. Bid Proposal Forms: All prospective bidders requesting to obtain the official Bid Proposal Form must submit a completed Bid Proposal Request Form (Part C) to the DOT Contracts Unit per the above instructions. If the Bid Proposal Request Form (Part C) and the Contractor Prequalification Application are found to be satisfactory, the bidder will receive an email response from the Department instructing the bidder to download the electronic Bid Proposal Form Bid Bond Security: Except when otherwise specified in the bid documents, no proposal will be considered unless; (a) it is accompanied by a proposal guaranty from a surety company in the form of the Department s (CTDOT) standard bid bond form furnished by the Department, as may be revised, satisfactory to the Commissioner, in an amount equal to at least 30% of the amount of the bid; or (b) the bidder has on file in the Contract Section a current Department (CTDOT) standard annual bid bond form, satisfactory to the Commissioner, on the form furnished by the Department. DOT encourages bidders to file an Annual Bid Bond with the Department so that the bidder does not have to submit a bid bond each time they bid on a specific project/proposal. At the time of the bid opening, the surety must be a corporate surety licensed by the Insurance Commissioner of the State of Connecticut and must hold a Certificate of Authority as an acceptable Surety and/or Reinsuring Company acceptable to the Federal Department of Treasury. The surety's underwriting limitation must not be less than the full amount required by the bond itself. Pre-Bid Questions and Answers: Questions pertaining to DOT advertised construction projects must be presented through the CTDOT Pre-Bid Q and A Website. The Department cannot guarantee that all questions will be answered prior to the bid date. Please Note - at 9:00 am Monday (i.e. typical Wednesday Bid Opening) the project(s) being bid will be closed for questions, at which time questions can no longer be submitted through the Q and A Website. Answers may be provided by the Department up to 12:00 noon, the day before the bid. At this time, the Q and A for those projects will be considered final, unless otherwise stated and/or the bid is postponed to a future date and time to allow for further questions and answers to be posted. If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. Prevailing Wage Rates: The minimum rates to be paid labor of the various classifications shall be in accordance with current schedule of wages established by the State Labor Commissioner as provided in the Connecticut General Statutes, as revised. The Contract Wage Certification Form is to be submitted to the Labor Commissioner before the award of the contract. The Department, prior to the awarding of any contract, may require further financial and other information from any applicant who becomes the low bidder for that contract. The Commissioner of Transportation reserves the right to reject any and all bids. CTDOT - Darien Railroad Station Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work under this item shall consist of surveying the existing concrete substructure, locating all cracks to be repaired and repairing the cracked concrete with a two-component modified epoxy resin system injected into the cracked concrete under low pressure using continuous positive displacement metering and mixing equipment as directed in accordance with these specifications. This item shall also include providing of a safe access to the structure for delineation of the repair locations and review of the performed repair work. The Contractor shall not perform any repair work without prior approval of the Engineer for location, limits, and types of repairs. 0101117A

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents