Similar Projects
3/4 Minus Crush Gravel and 3/8 Seal Coat Aggregate
Infrastructure
Bidding
Kalispell, MT

Asphalt Material Project
Infrastructure
Bidding
Kalispell, MT

Deadmans' Supply Canal Rehabilitation
Alteration
Post-Bid
MT

Sanding Material 1A-Location Butte Area
Infrastructure
Post-Bid
Butte, MT

204 Grandview Dr - Reserve Dr Upgrades
Alteration
Results
Kalispell, MT

Sanding Material 2-Locations Bozeman Area
Infrastructure
Results
Bozeman, MT

Sanding Material 1B-Location Missoula Area
Infrastructure
Post-Bid
Missoula, MT 59808

Sanding Material 1B-Location Butte Area
Infrastructure
Post-Bid
MT

Sanding Material 2-Locations Butte Area
Infrastructure
Post-Bid
Butte, MT

Sanding Material 1-Location Butte Area
Infrastructure
Post-Bid
Butte, MT

Sanding Material 1-Location Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Sanding Material 1-Location Lewistown Area
Infrastructure
Post-Bid
Lewistown, MT

Sanding Material 2-Locations Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Sanding Material 1A-Location Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Sanding Material 2-Locations Kalispell Area
Infrastructure
Post-Bid
Kalispell, MT

Reported 02/15/2022 03:26 PM
Project Title

Ackley Outlet Canal Liner And Two Dot Canal Liner Project

Physical Address View project details and contacts
City, State (County) Hobson, MT   (Judith Basin County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal of excess sediment, shaping, and grading, in a 5,450 lineal foot section of the Deadman’s Supply Canal. The work generally includes removal of excess soil and vegetation from the canals, grading and shaping the canal invert and side slopes to design elevations and grades, stockpiling of removed materials, general site cleanup, seeding, and incidentals.

Details

Division 01 - General Requirements, Temporary Controls, Temporary Erosion and Sediment Control.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Stabilization Measures for Erosion and Sedimentation Control, Structural Measures for Erosion and Sedimentation Control, Rock Barriers, Retention Measures for Erosion and Sedimentation Controls, Rock Basins.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents