Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Road Test Staff Room Renovations - Motor Vehicle Commission Facility
Renovation
Bidding
Less than $77,898 est. value
Randolph, NJ 07869

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Post-Bid
Less than $95,000,000 est. value

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Restoration & Rehabilitation of The Lock and Lock Tender House - Lock 2 East of The Morris Canal
Results
Wharton, NJ 07885

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Sources Sought Notice for Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Facilities in the North Area of Responsibility (AOR)
Post-Bid

Martin Berry House Phase 1 and 2 Rehabilitation
Renovation
Results
Pompton Plains, NJ

USACE Philadelphia District Multi-State Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration & Modern and Minor Construction
Post-Bid
$5,000 to $4,000,000 est. value

Reported 05/15/2020 12:00 AM
Project Title

Morris Hills Academy Engineering Lab Renovation

Physical Address View project details and contacts
City, State (County) Rockaway, NJ   (Morris County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the renovation of existing areas of the Morris Hills Academy Building to create new Machine Room space for the Engineering Lab, including but not limited to new finishes, lighting, ceilings, mechanical, electrical, and all associated work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents