Similar Projects
Annular Steel Culvert
Term Contract
Bidding
Boulder, CO

2021 Road and Drainage Project
Bidding
Gunnison, CO

SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

North Cow Creek Culvert
Bidding
Steamboat Springs, CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

2021 Ditch Cleaning Project
Bidding
Gunnison, CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Homestake Surge Pond Rehabilitation Project
Bidding
CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Last Updated 02/03/2021 04:02 AM
Project Title

152nd Avenue and Imboden Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 152nd Avenue and Imboden Road Drainage Improvements begin at the intersection of 152nd Avenue and Imboden Road and run east along 152nd Avenue. This project will focus on improving the drainage in the area and will consist of regrading the existing roadside ditch primarily on the south side of East 152nd Avenue, relocating existing utilities to maintain adequate coverage, and incorporating new culverts along the alignment. A set of construction documents has been prepared by HKS along with a set of subsurface utility engineering investigation existing utility plans, see Appendix A and B, respectively.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Schedules for Utilities, Schedules for Storm Drainage Utilities, Storm Drainage Schedule, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents