Similar Projects
Replace Historic Scotty's Castle Climate Control System
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
CA

Removal/Replacement of HVAC Units Project
Renovation
Sub-Bidding
$700,000 CJ est. value
Hanford, CA 93230

Administration / Courthouse HVAC Replacement
Renovation
Sub-Bidding
$1,018,840 CJ est. value
Brawley, CA 92227

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Architectural Services for HVAC Systems And Development Of New Permanent Modular Building(s)
Renovation, Alteration
Results
Buttonwillow, CA 93206

Phase II District-Wide Building Automation HVAC Systems and Lighting
Alteration
Results
Concord, CA

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services
Term Contract
Sub-Bidding
Arvin, CA 93203

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

AHU Replacement Fresno Armory
Alteration
Results
$350,000 est. value
Fresno, CA 93727

Boiler Maintenance and Repair services in Calaveras, Alpine, Touloume, and Amador County
Term Contract
Sub-Bidding
San Andreas, CA 95249

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

HVAC Services
Alteration
Results
Oroville, San Joaquin, San Luis Obispo, CA

Heating Ventilation and Air Conditioning (HVAC) Ductwork Relocation Services
Renovation
Sub-Bidding
$200,000 CJ est. value
Oakland, CA 94612

J041--VA Palo Alto Health Care System Chiller and Cooling Tower Maintenance Services
Term Contract
Post-Bid
Livermore, CA 94550

Last Updated 09/26/2022 03:03 PM
Project Title

HVAC/AIR Handler Replacement - Science Building 53

Physical Address View project details and contacts
City, State (County) Seaside, CA 93955   (Monterey County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of the removal and disposal of 9 gas-electric rooftop units, replace 9 existing air conditioning units (AC-2 through AC-10) with new curbs and new air handlers (ahu-2 through ahu-10) supplied with hydronic heating and cooling coils. New air handling units to be supplied with new heating hot water and chilled water to building from existing campus heating and chilled water supply and return piping located in existing parking lot vault. New building circulation pumps for heating and chilled water will be installed at the base of the building and mount on a new concrete slab. Contractor License Type B General Building Contractor C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor The last day to submit your financial prequalification to the Chancellor’s Office is September 21, 2022 Question Deadline 09/16/2022 at 2:00 PM PT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents